Copyright © 2016 Ruckus Wireless, Inc.
Published June 2016, Part Number 800-71242-001 Rev A
Page 2 of 4
T610
S
S
ECTOR
A
NTENNA
C
OVERAGE
The T610s 120-Degree Sector AP is best deployed where
internal-antenna beamforming can provide extended reach and
throughput to a 120-degree coverage area. See Figure 2 for the
azimuth coverage pattern, and see Figure 3 for the elevation
coverage pattern.
Figure 2:
Typical AP sector azimuth plane coverage, top view
Figure 3:
Typical AP sector elevation plane coverage, side view
S
TEP
1: C
ONNECTING
AND
S
EALING
THE
RJ-45
C
ABLES
Connect and seal the RJ-45 cable(s) using the M25 data cable gland
as shown in Figure 5.
WARNING:
Do not use any PoE injector not tested and approved by
Ruckus Wireless to power the T610s Access Point.
WARNING
: Do NOT plug PoE in power into the non-PoE Port (see
Figure 4).
Figure 4:
T610s bottom view
1
Feed the end of the cable through the sealing nut, rubber O-ring,
clamping ring assembly and cable gland base as shown in Figure
5.
Figure 5:
RJ-45 cable and cable gland assembly
2
Use a wide flat-blade screwdriver to remove the required (PoE IN)
blanking cap from the T610s.
3
Connect the cable to the Ethernet port on the T610s.
4
Tighten the cable gland base into the T610s chassis to 7 N.m or
62 in-lbs.
5
Wrap the clamping ring assembly around the rubber O-ring. Make
sure that the clamping ring assembly fully encloses the rubber O-
ring.
6
Seat the clamping ring assembly and rubber O-ring in the cable
gland base.
7
Hand-tighten the sealing nut.
S
TEP
2: A
TTACHING
THE
U-J
OINT
B
RACKET
TO
THE
M
OUNTING
B
RACKET
NOTE:
The following mounting instructions require purchase of
optional accessories that are not included in the standard T610s
package. The outdoor AP Mounting Bracket and safety cable are
optional accessories that must be purchased separately.
1
Position the U-joint bracket on the mounting bracket.
Figure 6:
U-joint bracket attached horizontally to the mounting bracket
NOTE:
Mount the U-joint bracket in any direction on the mounting
bracket, preferably to allow AP azimuth adjustments. Then the AP
bracket allows AP elevation adjustments.
2
Use four 1/4-28 bolt and washer sets (A) to mount the U-joint
bracket (B) to the mounting bracket (C). Tighten the bolts to 9.5
N.m (7 ft-lbs).
3
Continue with
Step 3a: Attaching the Mounting Bracket to a
Flat Surface or Step 3b: Attaching the Mounting Bracket to a
Metal Pole.
S
TEP
3
A
: A
TTACHING
THE
M
OUNTING
B
RACKET
TO
A
F
LAT
S
URFACE
1
Place the mounting bracket at the location on the flat surface
where you want to mount the AP. Use the holes on the mounting
bracket as a template to mark the locations of the mounting
holes.
Figure 7:
Mounting bracket flat surface holes
2
Remove the mounting bracket from the flat surface.
3
Drill holes required for the mounting hardware.
NOTE:
The hardware required for mounting to a wall are not included
in the mounting kit.
4
Attach the mounting bracket to the flat surface using the
mounting hardware.
Extended
120º Reach
Extended
30º Vertical
Beamwidth
10º - 20º Downtilt
Recommended for
Extended Coverage
Cable gland base
Clamping ring assembly
Rubber O-ring
Sealing nut
C
B
A