Preparing to Set Up the SmartCell Gateway 200
Unpacking the SCG
SmartCell Gateway 200 Getting Started Guide for SmartZone 3.4, 800-71126-001 Rev A
10
Unpacking the SCG
WARNING!
The SCG appliance is heavy (40 lbs/18.14kg). Two people should work
together to unpack the SCG. Ruckus Wireless strongly recommends against one
person attempting to perform this task alone.
Follow these steps to unpack the SCG appliance.
1
Open the SCG package, and then carefully remove the contents.
2
Return all packing materials into the shipping box, and then put the box away
in a dry location.
3
Verify that all of the items listed in
Verifying the Package Contents
(below) are
included in the package. Check each item for damage. If any item is damaged
or missing, notify your authorized Ruckus Wireless sales representative
immediately.
Verifying the Package Contents
A complete SCG package contains all of the items listed below:
•
One SCG appliance with two AC/DC power supply units
•
One console cable (use only this cable to connect the front or rear serial port via
a laptop/notebook)
•
below)
•
Service Level Agreement / Limited Warranty Statement sheet
•
Regulatory Statement sheet
•
This
Getting Started Guide
NOTE:
The AC power cable (part number 902-0174-XX00, where XX is the two-
character country code) is not supplied with the SCG appliance and may be ordered
separately.