DT2350 2-Channel Strain Gauge
Load Cell Data Logger Manual
ELM0099A
RST Instruments Ltd.
Page 7
F
IGURE
3-6
A
CTIVATE THE BATTERY
10
Replace the cover. Loosely tighten each screw in the X pattern as shown in
Figure 3-7. Then securely tighten each screw in the X pattern.
F
IGURE
3-7
T
IGHTEN SCREWS IN THE FOLLOWING ORDER AND PATTERN
CAUTION
:
E
NSURE THE
DT
L
OGGER
H
OST SOFTWARE AND
USB
D
RIVERS ARE
INSTALLED
BEFORE
PROCEEDING FURTHER
.
11
Unscrew the cover of the mini-B USB port. Refer to Figure 3-8.
F
IGURE
3-8
M
INI
-B
USB
P
ORT