Before beginning the cabinet installation, you will need to 

 

apply the finished overlays to the side (s) of the cabinet or run of 

cabinets that will be exposed to the room. Just follow the below 

simple steps to apply the flush fit end panels.

Materials:

Finished Flush Fit End Panel, Roll of Double Sided Tape 

 

(Suggest 1 roll per flush fit end panel) or construction 

 

adhesive. (Neither are provided.)

Toe Notch Instructions 

Note: If flush fit end panel is on the left side of cabinet, the toe 

notch will be on the right side of the flush fit end panel. If the flush 

fit end panel is for the right side of the cabinet, the toe notch will 

be on the left side of the flush fit end panel. 

 

Toe notch out the flush fit end panel.

    

a)  Line up the bottom of toe notch with the bottom of 

the overlay     

b)  Using a pencil draw a line along the edge of the 

toe notch     

c)   Using a jigsaw or hand saw, cut along the line. 

Make sure the saw blade is inside the toe notch 

area, which will be removed.     

d)   Any left over pencil marks can be erased with a 

pencil eraser.

  1.  

   Cut and apply double sided tape to flush fit end panel or 

use construction adhesive (Figure 2). If using construction 

adhesive, use tape guidelines as glue guideline and then 

move to Step #2.

a)   Cut the roll of double sided tape into strips. Cut 

tape strips to the lengths and quantities listed on the 

tape template.  You will need approximately one 

roll of tape for each flush fit end panel. 

b)   Apply the tape to the flush fit end panel following 

the tape template diagram.  Tape strips applied 

along the edges of the flush fit end panel should be 

1/4” from the edge.

c)   As you apply each tape strip, run your finger along 

the strip, applying pressure to make sure the tape 

makes complete contact with the flush fit end panel. 

 

  2.  

   Apply flush fit end panel to cabinet side panel 

a)   Remove the backer from each tape strip.

b)   Holding the flush fit end panel at an  angle from the 

cabinet side panel, slide the front edge of the flush 

fit end panel  into the face frame groove. Make sure 

the entire edge of the flush fit end panel  is seated 

inside the face frame groove. 

c)   Align the top of the flush fit end panel with the top 

of the cabinet side panel  and press the flush fit end 

panel against the side panel. 

d)   Working from front to back, apply pressure along 

the entire surface of the flush fit end panel to make 

sure each tape/adhesive strip makes complete 

 

contact with the cabinet side panel. 

e)   Allow the tape/adhesive to cure for 1 hour before 

proceeding with the cabinet installation.

Step 2. Flush Fit End Panel Application Instructions

NOTE: TAPE/ADHESIVE SHOULD BE APPLIED 1/4” FROM EDGES OF FLUSH FIT END PANEL.

Strip/

Adhesive

LEFT

SIDE

RIGHT

SIDE

Strip/

Adhesive

Strip/

Adhesive

Strip/

Adhesive

Strip/

Adhesive

Strip/

Adhesive

Strip/Adhesive

Strip/Adhesive

Strip/Adhesive

Strip/Adhesive

Figure 2

Summary of Contents for MasterBath

Page 1: ...ATE STUDS Locate the wall studs with a stud finder or tap on the wall to locate a solid sound This generally will tell you where the wall studs are located You can verify this location by driving a small finishing nail into the wall Make sure this is an area that will be covered by the base cabinets Mark a chalk line at the center of the wall studs at the top and bottom of the cabinet position Nor...

Page 2: ... quantities listed on the tape template You will need approximately one roll of tape for each flush fit end panel b Apply the tape to the flush fit end panel following the tape template diagram Tape strips applied along the edges of the flush fit end panel should be 1 4 from the edge c As you apply each tape strip run your finger along the strip applying pressure to make sure the tape makes comple...

Page 3: ...igure 7 Upper face frame Lower face frame SIDE PANEL MENDING DETAIL Upper side panel Lower side panel 2 PIECE LINEN ASSEMBLY The 15 Linen 18 Linen with Drawers and 18 Linen with Doors are 2 piece units that require assembly prior to installation Place the upper linen unit on top of the lower linen unit The upper unit has six attachment brackets in place at the bottom interior of the unit Figure 6 ...

Page 4: ...r and scribe it to the wall s shape Figure 8 Fillers may also be used to accommodate wall to wall installations where the cabinets do not fit exactly Once you have identified the starting point take the first cabinet and shim it to the previously established level line Drill pilot holes at the stud location through the back rail and into the studs Then securely fasten the cabinet to the wall using...

Page 5: ... top of the counter top Fasten the hutch by drilling pilot holes at the stud location through the back rail Then fasten the hutch to the wall with 8 x 2 screws If the hutch sits in between the studs you will need to use toggle bolts to fasten the hutch to the wall For water protection it is recommended that you caulk the hutch to the countertop or to install a side splash around the bottom edge of...

Page 6: ...f the cabinet until they stop Figure 19 Set the drawer back in the glide tracks and push the drawer all the way into the cabinet The glides will align automatically when the drawer box is pushed back in Slide drawer back 5 6 times to self adjust DRAWER GLIDES MASTERBATH ELITE To remove the drawer from the cabinet extend the drawer to the outer most location Then reach underneath the drawer to the ...

Page 7: ...ll from the out side of the drawer to the inside A 3 16 drill bit is recommended to allow for final adjustments for exact alignment Figure 21 DOOR HARDWARE PLACEMENT Hardware Placement Guide provided Place the handle hardware guide on the corner of the cabinet door where you would like to have your handle located Mark the point on your door that corresponds to the size of your handle hardware and ...

Page 8: ... 3 8 behind face frame two holes on right side and two holes on left side Use a 3 16 drill bit Secure filler in place with 6 x 15 8 screws Remove clamps CURVED FRONT CABINET Space cabinets 3 apart Clamp filler and any necessary shims in place Shim to be used on cabinet adjacent to curved cabinet Figure 24 Follow remaining instruction under Cabinet Installation above Step 10 Toe Kick Installation T...

Page 9: ...to place and using a 8 x 2 wood screw secure the cabinet to the wall Figure 27 Step 12 Decorative End Panel Decorative End Panel is installed over the flush Fit End Panels See Step 2 Remove the cabinet door This allows access to clamp the end panel Pre drill eight holes around perimeter 1 from edge of cabinet side panel from the inside Figure 28 Measure down 1 4 from the top of the cabinet Make a ...

Page 10: ...s or drawers from the sink base cabinets or drawer banks the decorative toe kick is designed to fit under the sink base or drawer bank in the cabinet run Once the doors are removed clamp the toe kick into place Measure in 1 from the front edge of the base cabinet floor or just behind the face frame Using a 3 16 drill bit pre drill three holes Using 6 x 1 wood screws secure the toe kick into place ...

Page 11: ...ge facing out 4 INSTALL BOTTOM HINGE Figure 32 NOTE Make sure screws on Pivot Hinge are facing INTO the cabinet 5 ATTACH TOP OF HINGE SET Figure 34 6 ATTACH DOOR Figure 35 Place hinge bushing onto pivot hinge Insert pivot hinge into top rail Slide bottom of mirror door into bottom pivot hinge Tighten screw NOTE Doors require adjustment or glass could break 7 INSTALL PUSH LATCH AND STRIKE PLATE Fig...

Page 12: ...hing Do not use caustic agents and or abrasive scrubbers Nicks and dings can be repaired using the color sticks Fill in the scratch or nick using the color stick A Clear Coat spray may be applied if desired INTERIOR CARE AND CLEANING Cabinets can be cleaned with a damp sponge or cloth using soapy water Do not use any type of abrasive scrubbers Do not let liquids stay on the surfaces for a long per...