background image

PLEASE: read this manual!

This manual will guide you through installation,
operation and maintenance procedures for your
new WATER-MIZER. Proper installation and operat-
ing practices will ensure years of trouble-free service.

Technical support: (800) 221-9723 x135

If you have questions, review the troubleshooting
guide on Page 7. If you still have questions, call our
technical support group at (800) 221-9723 x135.
Technicians are available from 8:00 a.m. to 4:30 p.m.
(Pacific Time) Monday through Friday, excluding
major holidays.

For information about other RPI parts,

please contact us:

Replacement Parts Industries, Inc.
20338 Corisco Street • Chatsworth, CA 91311
Telephone: (800) 221-9723 or (818) 882-8611
Fax: (818) 882-7028
E-mail: [email protected]
Website: www.rpiparts.com

08-31-09 Water-Mizer® Patent Official: 7, 578,967

Water-Mizer is a registered trademark of its respective holder.

Summary of Contents for WATER-MIZER RPA466

Page 1: ...d and save these instructions WATER MIZER Water saving tempering device for sterilization equipment Installation operation and maintenance manual Proud to be an ISO 9001 certified company RPI Part RPA...

Page 2: ...ill have questions call our technical support group at 800 221 9723 x135 Technicians are available from 8 00 a m to 4 30 p m Pacific Time Monday through Friday excluding major holidays For information...

Page 3: ...s 2 Warranty 9 Installation Installation instructions 3 Mounting 4 WATER MIZER table of contents Table of Contents Operation Start up and operation instructions 5 Maintenance Maintenance instructions...

Page 4: ...R MIZER through piping connected to the top threaded connection A vacuum breaker prevents backflow into potable water systems Cold water enters through the temperature actuated valve The valve and the...

Page 5: ...G PLATE TO CENTER OF HOT WATER INLET 9 1 2 241 H HEIGHT FROM CENTER OF HOT WATER INLET TO TOP OF VACUUM BREAKER 3 76 J HEIGHT FROM BOTTOM OF MOUNTING PLATE TO CENTER OF TEMPERED WATER OUTLET 4 1 4 108...

Page 6: ...o the WATER MIZER as possible Install a cold water shut off valve before the union in the cold water supply line Installation checklist Installation Hot water inlet connection instructions Hot water i...

Page 7: ...hnique Mounting the WATER MIZER to the frame may require that holes be drilled in the frame Secure WATER MIZER to the frame of the sterilizer by attaching the integral mounting plate to the frame Note...

Page 8: ...valve s sensor located inside the chamber near the outlet ensures that water leaving the WATER MIZER is less than 140 F 60 C before entering the municipal sewer system Tempered water at 140 F 60 C or...

Page 9: ...mineral accumulation has occurred remove the split nut holding the sensor in place and remove the thermal sensor from the WATER MIZER chamber Gently clean the sensor with an abrasive pad Do not twist...

Page 10: ...sor from WATER MIZER and gently remove mineral accumulation with an abrasive pad Do not twist capillary tubing during removal or cleaning Valve is not set properly Adjust valve so drain effluent is be...

Page 11: ...ve shown below When you order a Replacement Valve with Sensor RPI Part RPV468 you will receive the style shown to the right RPV468 Important Note For Replacement Valve with Sensor please see Important...

Page 12: ...Any warranty claim must be submitted to RPI in writing within the stated warranty period Two year limited warranty RPI s limited warranty is made in lieu of and RPI dis claims all other warranties wh...

Reviews: