
November
2013
Page
19
ELECTRICAL INSTALLALLATION
BASIC ELECTRICALS
For your safety, turn off electrical power supply at service entrance panel before making any electrical connections to
avoid possible electric shock hazard. Failure to do so can cause severe personal injury or death.
Thermostat Power shut off while making connections.
Failure to do so may result in severe personal injury or death.
ELECTRICAL INSTALLATION MUST COMPLY WITH:
1) National Electrical Code and any other national,
state, provincial or local codes or regulations.
2) In Canada, CSA C22.1 Canadian Electrical Code
Part 1, and any local codes.
Appliance must be electrically grounded
as required by National Electrical Code
ANSI/NFPA 70 – latest edition. Ensure ground
wiring is installed per wiring diagram.
Good grounding is extremely important for
proper
operation.
DANGER
INSTALL WRING AS FOLLOWS:
1) SWITCH JUNCTION BOX
A) The following components are not included and must be
provided by the installer:
• 4 x 4 junction box
• (2) SPST switches
• Double hang switch cover
B) Attach 4 x 4 junction box to the furnace.
C) Route power (115 V, 60 Hz, 15 Amp) to the junction box.
D) Run 14-3 bx wire between the switch junction box and the
control center junction box.
E) Connect the MASTER switch as shown.
F) Connect FAN switch as shown.
NOTICE
1
A
Power
115v
Switch
Junction Box
To
Control Center
Junction Box
MASTER
FAN
RED
BLK
BLK
BLK
WHT
GREEN
WHT
GREEN
WHT
BLK
GREEN
WHT
BLK
RED
Circulation Blower (not shown)
n Blower (n
3
1
B
eath
h
.
.
4
5
Thermostat
Draft Blower
Blower
aft B
6
Fan Limit
Control
Power
115v
Switch
Junction Box
MASTER
FAN
RED
BLK
BLK
BLK
WHT
GREEN
WHT
2
C
A
D