background image

Fremont 65H

5

3. INSTALLATION

Note: The laminator should be installed by a trained service technician.

The laminator comes fully assembled.  Upon arrival, thoroughly inspect the unit. It is imperative that any shipping damage 

is reported and a claim is filed with the delivering carrier immediately upon receipt. 
The laminator should be located in an area with adequate work space for feeding graphics and lamination materials.
Avoid placing the laminator in a dusty area or near sources of extreme heat or cold.
Once the laminator is in place, lock the casters into position.  Always unlock the casters when moving to a different location.       

ELECTRICAL REQUIREMENTS

Royal Sovereign recommends that a licensed electrician ensures proper power installation to your laminator in accordance 
with electrical codes in your area.

120V UL

230V UL

240V UK

220V EU

220V AU

Summary of Contents for Fremont 65H

Page 1: ...65H Royal Sovereign International Inc Owner s Manual GRAPHIC LAMINATION PRODUCTS Please read and retain these instructions To register your product please go to www royalsovereign com www royalsovere...

Page 2: ...lation 5 5 Product Identification 7 6 Control Panel 8 7 Using Foot Pedal 9 8 Loading Film 9 9 Threading Film 9 9 1 Laminting 10 9 2 Mounting 10 11 Maintenance 10 12 Troubleshooting 11 10 Adjusting the...

Page 3: ...to provide years of continuous service For complete operating and maintenance information please read this manual thoroughly Upon receipt of your laminator please inspect the box the machine and all...

Page 4: ...machine 6 Place the laminator on a level surface then adjust the casters to the locked position in order to keep the laminator steady 7 Avoid excessive sunlight humidity and extreme temperatures 8 En...

Page 5: ...ld be located in an area with adequate work space for feeding graphics and lamination materials Avoid placing the laminator in a dusty area or near sources of extreme heat or cold Once the laminator i...

Page 6: ...pon receipt of shipment Part Name Quantity Picture Laminator 1 Owner s Manual 1 Spare Motor Fuse FUSE 50T 6 3A 1 Spare Main Power Fuse FUSE 65TS 10A 20A 1 Key 2 Fremont 65H Royal Sovereign Internation...

Page 7: ...ake 3 Emergency Switch 11 Knob Speed Control 4 Roller 12 Button 5 Safety Sensor 13 Pressure Gauge 6 Table Front 14 Pressure Regulating Valve 7 Caster 15 Reversing Valve 8 Foot Switch 16 Door Lock 17 G...

Page 8: ...op To start or stop the rollers Pressure gage To indicate the pressure of top roller from 0 to 1Mpa Height control crank To set the height limit block Make sure the upper roller is in the highest loca...

Page 9: ...o stop the rollers 8 LOADING FILM Royal Sovereign films are wound with the adhesive side facing the inside of the roll adhesive in Loading laminate to the upper film shaft Remove the upper film supply...

Page 10: ...Please Adjust the wheel to Change the roller pressure with different Material for the best Laminating quality 1 Lay the decaled image face down on a flat surface Carefully peel back and put a crease...

Page 11: ...switch es b Remove any material that may be blocking the Safety Sensor d Replace the motor fuse The unit is not heating up a Did not raise the temperature a Raise the temperature Curled lamination a U...

Page 12: ...Width 65 1650mm Maximum Material Diameter Film 200mm Maximum Laminating Speed 6m min Ready Time 40min Heating Method Hot Roller Maximum Temperature 122 F 50 C Film Core 3 Auto Grip Roller Nip Max 30m...

Page 13: ...ased Model serial number and date of delivery are required for all claims The warranty made herein is in lieu of all other warranties expressed or implied including any warranty or merchantability or...

Reviews: