1
Before operation, please read this manual
carefully, so as to use this product properly.
Preface
We heartily thank you for choosing our massage tub series product. This product, belonging to the new-generation healthy
and leisure category, has been meticulously made with carefully selected materials, with the features of simplicity, elegance,
comfort, practicality high quality and affordability, etc. It will bring you infinite relaxation and delight of shower.
Before unpacking, please check the parts and make sure no parts are lacking according to the drawing, and please carefully
analyze the product structure and installation positions of the parts. Install according to the instructions and pay attention to the
following:
1) We will provide you with high quality warranty services for the product you have chosen: To protect your interest, please
carefully fill the product warranty card. If you need other services, please contact your dealer or directly contact our
company.
2) During storage of this product, please do not place it upside down or obliquely; do not pile up things on the product; do
not storage it together with formic acid, formaldehyde organic solvents. When carrying it, please handle with care and avoid
heavy load, strong vibration and collision.
3) The warranty does no cover product damage or failure caused by improper installation by user or caused by operation
not in accordance with operation processes shown in the product manual.
4) To achieve optimal performance of this product, we suggest using original parts from our company.
5) After unpacking, the glass should be carried vertically by two persons. To prevent glass surface scratch, please mat the
glass surface with soft material before installation.
Before installation
1. Before installing this product, please make sure that water supply, power supply and sewage pipes are ready at the
installation area. For specific installation locations, please see the technical parameter diagram of this product. This product's
working water pressure is 0.1 ~0.6Mpa; water supply adopts G1/2 threaded cold/hot water connecters; please see the
electric parameter plate for the electric parameters. This product requires the installation area to reserve 1 1/2 sewage
pipeline.
2. The products of our company adopt integrated assembly technology, with different components assembled before
leaving factory. Before unpacking, please check that the product model, specs and configuration meet your order.
3. After unpacking, please carefully check if the product parts are complete and not damaged during shipping. If any
problem is found, please contact the dealer of our company.
4. Before installation, please prepare these tools: Phillips screwdriver, slotted screwdriver, level bar and wrench.
Installation tools
Level bar
Rubber hammer
Caulk Gun
Cross point
screwdriver
Drill&Assorted
Drill Bits
Pencil
Measuring tap
Claw hammer
Allen key
A drill of 6mm
diameter