background image

Before operation, please read this manual 
carefully, so as to use this product properly. 

Preface 

We heartily thank you for choosing our massage tub series product. This product, belonging to the new-generation healthy 

and leisure category, has been meticulously made with carefully selected materials, with the features of simplicity, elegance, 

comfort, practicality high quality and affordability, etc. It will bring you infinite relaxation and delight of shower. 

Before unpacking, please check the parts and make sure no parts are lacking according to the drawing, and please carefully 

analyze the product structure and installation positions of the parts. Install according to the instructions and pay attention to the 

following: 

1)  We will provide you with high quality warranty services for the product you have chosen: To protect your interest, please 

carefully  fill  the  product  warranty  card.  If  you  need  other  services,  please  contact  your  dealer  or  directly  contact  our 

company. 

2)  During storage of this product, please do not place it upside down or obliquely; do not pile up things on the product; do 

not storage it together with formic acid, formaldehyde organic solvents. When carrying it, please handle with care and avoid 

heavy load, strong vibration and collision. 

3)  The warranty does no cover product damage or failure caused by improper installation by user or caused by operation 

not in accordance with operation processes shown in the product manual. 

4)  To achieve optimal performance of this product, we suggest using original parts from our company. 

5)  After unpacking, the glass should be carried vertically by two persons. To prevent glass surface scratch, please mat the 

glass surface with soft material before installation.  

Before installation  

1.  Before installing this product, please make sure that water supply, power supply and sewage pipes are ready at the 

installation area. For specific installation locations, please see the technical parameter diagram of this product. This product's 

working water pressure is 0.1 ~0.6Mpa; water supply adopts G1/2 threaded cold/hot water connecters; please see the 

electric parameter plate for the electric parameters. This product requires the installation area to reserve 1 1/2 sewage 

pipeline.  

2.  The  products  of  our  company  adopt  integrated  assembly  technology,  with  different  components  assembled  before 

leaving factory. Before unpacking, please check that the product model, specs and configuration meet your order. 

3.  After unpacking, please carefully check if the product parts are complete and not damaged during shipping. If any 

problem is found, please contact the dealer of our company. 

4.  Before installation, please prepare these tools: Phillips screwdriver, slotted screwdriver, level bar and wrench. 

Installation tools 
 

 

Level bar 

Rubber hammer 

Caulk Gun 

Cross point 
screwdriver 

Drill&Assorted 
Drill Bits 

Pencil 

Measuring tap 

Claw hammer 

Allen key 

A drill of 6mm 
diameter 

Summary of Contents for B313

Page 1: ...Installation and Operation Manual...

Page 2: ...er or caused by operation not in accordance with operation processes shown in the product manual 4 To achieve optimal performance of this product we suggest using original parts from our company 5 Aft...

Page 3: ...wer supply 8 Before connecting cold and hot water pipes please discharge the water that has been staying inside the pipes so as to prevent damaging water control equipment 9 Children using this produc...

Page 4: ...the connector indication in connection Note One valve for cold water pipe and one valve for hot water pipe must be installed 4 Power connection Securely connect the power cables to the all pole disco...

Page 5: ...wer head switching single handle and drainer 1 Shower head Hand held shower head can be lifted according to requirement 2 Waterfall Main water inlet 3 Temperature adjustment Controls water temperature...

Page 6: ...hot water pipe due to cold water pressure higher than hot water pressure Please check the configuration of the product purchased when referring to water pipeline diagram Water pipe diagram for round h...

Page 7: ...6 Water pipe diagram for conical kit Shower head Waterfall Function switching Temperature adjustment Tub surface Installation drawing Radio antenna Cold water in Blue Hot water in Red...

Page 8: ...cian is requiried to install the system The leakage protection switch should be installed in the right place Or manufacture will not be responsible for user because of it Please make sure all wirings...

Page 9: ...it will show the present water temperature 10 C 50 C but system will show the setting is 40 C AII can be worked as user s need Press main switch t then close down all system 2 Water inflow or outflow...

Page 10: ...it When starts LCD shows O3 and lasts 30 mins then closed by automatically 8 Telephone function When start the panel or during FM or AUX if calling need answer to FM or AUX will be closed the speaker...

Page 11: ...e electrical facilities should meet national safety standards Power voltage and frequency should tally with parameters on product electrical plate Special attention should be paid to install leakage p...

Reviews: