background image

Window glazing

Wooden beading

Window frame

13. Window glazing

We recommended that a waterproof sealant is applied around the edge of the glazing before fitting. Place window pane on the inside of the window frame, Using 3 x 20mm

nails per beading strip. nail the top and bottom strip first and then the sides. Repeat for all three windows.

2012 © Rowlinson Garden Products Ltd

We constantly improve the quality of our products,

occasionally the components may differ from the

components shown and are only correct at time of

printing. We reserve the right to change the

specification of our products without prior notice.

If in doubt of any aspect regarding the assembly, use or safety of your playhouse please contact us :

Help Line (Normal Office Hours) 01829 261121

ROWLINSON GARDEN PRODUCTS LIMITED

Green Lane

Wardle Nr.Nantwich

Cheshire

CW5 6BN

10mm

10mm

View of door frame from inside playhouse

50mm

19mm

Important safety and maintenance information - Retain for future reference

This product is not suitable for all children under 36 months, due to it having small parts and sharp points.

For Family domestic use only.

For outdoor use.

Ensure any loose knots are removed from any panels, to reduce risk of choking. Fill holes with a suitable wood filler obtained from most DIY stores.

It is recommended that the playhouse is positioned on a level surface at least 2m from any structure or obstruction such as a fence, garage, house, overhanging

branches, laundry lines, electrical wires.

It is recommended that the playhouse is not installed on concrete, asphalt or any other hard surface.

The company takes every care to ensure all goods are clean and free from splinters and rough edges prior to leaving the factory.

Visually inspect the playhouse and to reduce the risk of splinter sand down any sharp edges or rough surfaces.

Checks and maintenance of the main parts (fixings, etc) should be made at the beginning of each season and at regular intervals throughout. If checks are not carried

out the product could become unsafe.

Ensure all fastenings are securely located.

Oil all metallic moving parts.

Ensure that the pointed ends of all nails, screws and other fastenings are not accessible on any surface of the constructed playhouse, and that all heads and surfaces

of these fastenings are either flush with the surface or countersunk.

Always ensure a safe, suitable treatment is used to ensure the safety of children and animals.

Assembly and installation instructions must be kept for further reference.

Shiplap buildings come ready stained but this is only a preparatory treatment.To

VALIDATE

the guarantee, the building must be properly treated with a recognised

external wood preserver

WITHIN 3 MONTHS

of assembly and

RE-TREATED ANNUALLY

thereafter.The building must also be erected on 50mm x 50mm

treated wooden or similar bearers (These are not supplied with the kit.) Ground contact must be avoided.

Timber Information.

As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose some

of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout the wooden

panels.This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or

the amount of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.

This product meets the requirements of BS EN 71 Parts 1 & 2:2011 and 3:1995

14. Door catch and handle

On the inside of the playhouse, fit the catch mounting block using 2 x 50mm screws to the frame of the apex panel at the top left corner of the door frame. The roller

catch is fitted to the mounting block and the catch plate is fitted to the door. Position them so that when the door is shut the two parts clip together. Once in position fix

the the two parts of the catch in place with 4 x 10mm screws. To the front of the door position the door handle half way up the right-hand side. Secure in place using

4 x 19mm black round head screws.

Summary of Contents for SS288A

Page 1: ...29x1815mm 5 17 Small front roof panel 980x1220mm 1 18 Small Rear roof panel 980x811mm 1 19 Large front roof panel 1900x1220mm 1 20 Large rear roof panel 1900x811mm 1 21 Felt battens 1015x29x29mm 4 22 Batten blocks 29x29x140mm 10 23 Roofing felt roll 10m 1 24 Short shaped baregeboard 1 25 Long shaped bargeboard 1 26 Short plane baregeboard 1 27 Long plane bargeboard 1 28 Door 1 29 Long side rear co...

Page 2: ...the panels as shown in the diagrams Small side panel Drill pilot holes for each screw in this section Drill Landing support back panel Large side panel Large side panel Small window Panel Large window panel Use this diagram to check the correct orientation of the corners Important Ensure the back panel and apex panel interlock correctly Apex panel Back panel 50mm 50mm 3 Door header and apex panels...

Page 3: ...up against the side panels Secure the landing in place using 7 x 50mm screws screw upwards through the support framing into the bearers of the floor Position the fence top rail to the apex frames ensure the rail is in line with the edge of the landing floor using 1 x 50m screws at each end of the rail Important Landing support block must be positioned the same height as the landing support framing...

Page 4: ...ls using 12 x 35mm nails Ensure the felt battens are flush to the edges of the panels In the same way attach two felt battens to the lower edge of the two large roof panels Flush to the front and rear edges of the large roof panel attach three bargeboard blocks using 2 x 35mm nails per block To the small roof panel attach two blocks front and rear See diagram below for correct spacing of the block...

Page 5: ...should go up to the roof apex fix in place using 3 x 35mm nails 10mm Felt nails 35mm 35mm 35mm 35mm 35mm 35mm 35mm 35mm 35mm 35mm 35mm 10mm Felt nails 10mm Felt nails 10 Roofing felt Cut the roll of roofing felt into four equal lengths Place a length along the short side of the roof At the front and along the lower edge of the roof leave an overhang of felt of at least 45mm Fold down the felt alon...

Page 6: ...ould become unsafe Ensure all fastenings are securely located Oil all metallic moving parts Ensure that the pointed ends of all nails screws and other fastenings are not accessible on any surface of the constructed playhouse and that all heads and surfaces of these fastenings are either flush with the surface or countersunk Always ensure a safe suitable treatment is used to ensure the safety of ch...

Reviews: