Important information - retain for future reference
Shiplap buildings come ready stained but this is only a preparatory treatment. To
VALIDATE
the guarantee, the building must be properly treated with a recognised
external wood preserver
WITHIN 3 MONTHS
of assembly and
RE-TREATED ANNUALLY
thereafter. The building must also be erected on 50mm x 50mm
treated wooden or similar bearers (These are not supplied with the kit.) Ground contact must be avoided.
Timber Information.
As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose
some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout
the wooden panels. This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on
the building or the amount of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.
2008 © Rowlinson Garden Products Ltd
25mm
View from outside of building
25mm
50mm
25mm
It will be necessary to
drill holes for the four
coach bolts using a
6mm diameter drill bit.
Drill
Secure the coach
bolts on the inside
of the door using
nuts and washers.
30mm
30mm
30mm
30mm
30mm
9. Coverstrips, bargeboards and finials
Fit a coverstrip into each corner, attach using 3 x 30mm nails per strip. The remaining three are used to cover the panel joins on each side and the back, attach using
3 x30mm nails per strip. Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in the middle secure using
3 x 30mm nails per board. Attach a finial centrally over the join between the bargeboards use 2 x 30mm nails. In the same way fit two bargeboards and a finial to the back.
8. Fitting the door
Place the door into position. Fix the three T-hinges to the door with 4 x 25mm screws per hinge. Secure the hinges to the door frame using 3 x 25mm screws per hinge.
Fit the turn button to the door frame as shown using 1 x 25mm screw. Fit the padbolt to the door using 4 x 25mm screws and 2 x 50mm coach bolts, nuts and washers.
It will be necessary to drill holes for the coach bolts using a 6mm diameter drill bit. Fit the catch plate to the front panel, Ensure the bolt is able to slide into the catchplate,
attach using 2 x 25mm screws and 2 x 50mm coach bolts, nuts and washers, as shown below.
25mm
25mm
25mm
View from inside
of window
10. Fitting the windows
Fit two storm proof hinges in the rebates on the longer edge of the window as shown in the diagram using 2 x 25mm screws per hinge, stand the hinge end of the window
on the window panel, making sure it is centred at the top of the window opening. Open the hinges and secure them to the window panel frame using 5 x 25mm screws
per hinge. On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram.
Secure the hinges
to the longer edge