Rowlinson Playaway House Assembly Instructions Download Page 3

50mm

Drill

Drill pilot holes for
these screws.

50mm

30mm

Felt batten
Length 1500mm

Felt batten

6. Roof

Insert the roof purlin into the rebate at the top of the apex panels, secure in place using 2 x 50mm screws. Screw in through the apex cladding into the ends of the purlin.
Secure to each felt batten one large roof panel and one small roof panel using 9 x 30mm nails as shown. Ensure the felt batten is flush to the edges of the panels. Flush to
the front edge of each roof section attach two roof blocks using 2 x 30mm nails per block nail through the roof into the block. Position the roof panels onto the assembly,
make sure the top edges are located at the apex and the roof is flush with the back apex. Secure with 12 x 30mm nails per roof section, nail through the roof and into
the top frames of the building.

Felt batten

5. Apex  panels

Place an apex panel on top of the back panel, make sure the shiplap cladding of the apex fits correctly into the shiplap cladding of the back panel. Secure in place using
3 x 50mm screws. Screw up through the top frame of the back panel into the bottom frame of the apex. Attach the remaining apex to the front panel in the same way. 

Roof

7. Veranda  fence

Fit a coverstrip in each corner, secure in place using 3 x 30mm nails per strip. Position the veranda floor up against the front of the playhouse. Sit the veranda fences on
the floor and attach to the front wall of the building using 2 x 50mm and attach to the veranda floor using 2 x 50mm screws. For the veranda roof supports, position one
at the end of each veranda fence. Ensure the angle of the support is the same as the roof.  Attach the support to the fences and floor using 3 x 50mm screws per support
as shown. Secure the top of each support by screwing 1 x 50mm screw through the roof into the end of the support.

30mm

30mm

Roof

30mm

30mm

50mm

50mm

50mm

Felt batten
Length 1500mm

Ensure the top
edge of each roof
panel is located at
the apex.

Front edge

Left-hand roof section

Right-hand roof section

455mm

455mm

25mm

Roof blocks

Felt batten

Felt batten

Roof purlin Length 1178mm

30mm

30mm

50mm

Drill

Drill pilot holes for all
screws in this section

When attaching the veranda fence to the
front of building, drill and screw at a slight
angle to allow drill/driver access. Ensure
the screws tips do not come through to
the inside of the playhouse.

Summary of Contents for Playaway House

Page 1: ...rspex for door 520 x 545mm 1 22 Perspex for front window 575 x 520mm 1 23 Perspex for side window 478 x 398mm 1 24 Door beading 10 x 10 x 545mm 2 25 Door beading 10 x 10 x 503mm 2 26 Window beading 10 x 10 x 580mm 2 27 Window beading 10 x 10 x 503mm 2 28 Window beading 10 x 10 x 479mm 2 29 Window beading 10 x 10 x 380mm 2 30 Door hinge 1 No Fixing Kit Qty 31 Finials 2 32 Door handle 1 33 Magnetic ...

Page 2: ... using 2 x 50mm screws per panel screw through the panel frame through the floor and into the floor bearers 50mm 50mm 50mm Floor bearers Floor Panel frames Side panel Back panel 3 Wall panels Position the back panel and the side panel as shown Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge Ensure square and secure using 2 x 50mm screws through the fra...

Page 3: ...anel into the bottom frame of the apex Attach the remaining apex to the front panel in the same way Roof 7 Veranda fence Fit a coverstrip in each corner secure in place using 3 x 30mm nails per strip Position the veranda floor up against the front of the playhouse Sit the veranda fences on the floor and attach to the front wall of the building using 2 x 50mm and attach to the veranda floor using 2...

Page 4: ...every care to ensure all goods are clean and free from splinters and rough edges prior to leaving the factory Visually inspect the playhouse and to reduce the risk of splinter sand down any sharp edges or rough surfaces Checks and maintenance of the main parts fixings etc should be made at the beginning of each season and at regular intervals throughout If checks are not carried out the product co...

Reviews: