Panel frame
Floor
Back panel
Side panel
1. Floor
Prepare a level area for the shed to sit. Attach the floor frames to the floor panel. Have the two outer frames flush with the long edge (1230mm) of the floor and the two
middle frames equally spaced in between. Secure each frame in place by nailing through the floor panel into the frames using 4 x 30mm nails per frame. Attach four additional
(Not supplied in kit) treated wooden or similar bearers of size 50 x 50 x 1175mm to the floor.
3. Secure the walls to the floor
Ensure the panels are sitting square on the floor. Secure using 8 x 63mm screws. Screw through the panel frames and floor into the floor frames.
50mm
Floor frames
Floor
Panel frames
rest on floor.
50mm
panel cladding
overhangs floor
edge.
2. Wall panels
Position a large panel at the back and a second on the side of the floor. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge.
Ensure square and secure using 3 x 50mm screws. Screw through the frame of the side panel, into the frame of the back panel. Continue adding the remaining panels
securing them in the same way. It is important to have the front panels orientated correctly so that the framing creates a rebate for the door to fit in.
It is recommended to drill pilot holes
with a 3mm drill for each screw.
Drill
To "
VALIDATE
" the
guarantee, this item should
be erected on 50mm x
50mm treated wooden or
similar bearers
(These are
not supplied with the
kit.)
Ground contact must
be avoided.
Side panel
50mm
50mm
F
ront panels
Large plain panel
Back panel
Important Note:
Ensure correct orientation
of front panels. Make sure
the rebate edges face
inward for the door to fit in.
4. Apex panels and door header rail
Place an apex panel on top of the back panel, make sure the bottom shiplap board of the apex panel fits correctly into the shiplap board of the back panel. Secure using
2 x 50mm screws. Screw up through the top frame of the back panel into the bottom frame of the apex panel. Repeat for front apex. Attach to the front apex the door
header rail using 2 x 50mm screws. Secure it flush to the bottom of the apex framing.
It is recommended to drill pilot holes
with a 3mm drill for each screw.
Drill
30mm
1230mm
Large plain panel
Large plain panel
63mm
63mm
63mm
Use this diagram to check
the correct orientation of
the corners
Important