background image

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

Feedback…. 

As we are forever trying to make sure you are our happiest customer, we are always on the look-

out for ways in which we could do better. Please fax us on 

06 878 5758 

or send us an email to 

[email protected] with your thoughts. To help you we have listed a few aspects 
that we would like you to comment on. You do not have to include your details, but if you do we  

will forward you a 

free

 

gift. 

 

1.Finding out about our range of garden sheds and the various options we offer…. 

2.The store and the sales person that you purchased from…. 
3.The delivery and the overall dealings for the purchase of your shed…. 

4.The assembly of your shed and clarity of instructions…. 

5.Did the shed fit your needs? What will you order differently next time? 

Well done you have finished the panels…. 

Points to note as you construct your shed: 

Do not 

attempt to assemble panels in windy conditions 

Make 

sure your foundations are squared and level before erecting panels.  

It is 

easier to remove all swarf (filings) before you stand your walls up 

Complete

 all 

panels

 

before erecting your shed.

 

Keep a firm grip on panels when handling. If they slip they will cause damage.

 

Always wear non slip gloves protective footwear and eyewear

5: Now to join your corners and put your roof on…. 

1st:  Stand up the back wall and as your helping hand is holding it up bring the one end wall into meet it at the left corner 

overlapping the corners as Fig 

1

. Drill & Fix at approx 100mm down from the top and up from the bottom drilling 

and fixing from the outside. Make sure the walls are sitting flat and flush at the bottom. 

2nd: Bring the other end wall into the right back corner and perform the same again checking the bottoms 

are flush  

3rd:  Bring the front wall into place and join the front corners to the end walls same as the back.  
4th:  Finish joining corners by fixing at approx 300mm apart. You will find it easier to drill these corners if 

they are supported on the inside. Use the handle end of a hammer into the inside of the corner, but 
beware of drilling holes in the end of your hammer. 

5th:  With a person at each end of the roof panel with the Ridge beam attached, waft it over top of your 

upright walls and lower down on top. Have your helping hand go inside and make sure the roof panel 

is centralised by having the ridge beam sitting right on the apex of the channel at the peak of the end 
wall. Fix the “L” thru the top channel to both end walls at the 1st rib in from the lowest corner mak-

ing sure it is still centralised. The ridge beam will not be held down at this stage. 

6th:  Now waft the 2nd roof panel onto the walls, slipping it into the ridge beam. Make sure it is sitting 

firmly into ridge beam and then fix it to the inside flange of the ridge up underneath. (Fig 2) Now 
finish off fixing the “L”s to the top channels at both ends. Fix at 300mm apart and also thru end of 

ridge beam into “L”s. If you find the roof is binding and not wanting to sit squarely on the walls, this 

will be caused by unlevel site 

or

 walls are not square. Adjust accordingly.  

7th:  Using your ladder and tape measure, fix down thru the top of the roof, thru the pan into the top 

channel of front and back walls. (10mm more than the overhang). Fix beside every 2nd rib. (Fig 3). 
You will not need to worry about these fixings leaking as any water seeping thru these fixings will 

end up on the outside of the walls. 

8th:  Attach padbolt to door strap and fit door braces if not already done so. Check that all swarf is re-

moved and most importantly…. 

9th:  Fix your shed down to its foundations. If your foundations are unlevel or bowed, you will have prob-

lems with your padbolt and door levels. This can be fixed by slipping a spade under either door jamb 
and lifting. You will soon get a feel for which side needs propping up.  

Well done!

 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 4 

Recessed floor clamps 

For especially poured floors 

with recess around perimeter.  

Flat floor clamps 

For existing concrete only. 

Water can seep underneath. 

Fig 

1

 

Fig 

3

 

It is 

utmost

 essential that every shed has 

a  floor,  but  the  only  way  to  make  sure 

your shed is there to stay on windy sites is 
with a recessed concrete floor 

and 

phone 

0800 80 SHED 

for more free advise

Fig 

2

 

Bottom flange sits on top channel 
of end walls 

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

GM3023

 - Gable Roof Shed 

3030mm W x 2280mm D x 1830 - 2025mm H 

ASSEMBLY INSTRUCTIONS 

This shed has 

1 Box 

and 

1 Channel pack

” 

Quick Tips to keep in mind as I build my shed:

 

Try to remove swarf (drill filings) from panels as I assemble them. 
My basic job is to cap the sheeting to make the panels. Drill & Fix. 
All components are cut to length. 

Do not

 cut any parts unless instructed. 

They are only a phone call away 

0800 807 433

 or email to [email protected] 

Fixings thru the 

inside

 of the channels into the sheeting are just as 

important 

as the 

outside. 

What tools will I need?

 

Drill and drill bits - 3.3mm (1/8th”) for shed and 5mm (3/16th”) for padbolt  
Screwdriver or Riveter. (Note: all colour sheds come with rivets only) 
Tape measure for roof overhang. 

Ladder for fixing down thru the top of the roof. 
Tin snips for a small nik on top channel of gable end walls only.  
Non slip gloves, good shoes, goggles, a helping set of hands and 

no 

gusty winds! 

My basic

 pa

rts list…..

(fo

st

an

dar

sh

ed

s)

 

P

leas

e c

hec

par

ts

 c

ar

ef

ul

ly

 an

d a

dv

is

e i

m

m

edi

ate

ly

 if an

y d

am

age o

lo

ss

5 x 1830mm Sheets for back 
8 x 1200 sheets for roof. 

1 x 740mm wide sheet with 
door jamb attached 

Door pre-hinged  

to 2nd 740mm sheet 
with door jamb 

Pg 1 

1 x Pack of fixings with padbolt 

Screws for Zincalume sheds 

Rivets for Colour sheds 
2 x “Z” Door braces 

4 x Sloping sheets & 
2 x gable cut sheets 

for ends 

4 x 1200mm “L”s for  

flashing roof to end 
walls 

4 x 3000 channels for roof 

2 x 2255 channels for bottom & 
2 x 2290 channels for top of  
end walls 

4 x 3000 channels with ends cut for 

Front & Back walls 
 

2 x 793 Door spacers 

1 x 3000mm Ridge Beam 

2 x Gable plates for gable 

ends 

Reviews: