It is recommended to drill pilot holes in
the side panel framing with a 4mm drill
bit before assembly.

Drill

50mm

50mm

50mm

Door end panel

Side panels

Back panel

Back panel

Side panel

Panel frames
rest on floor.

Panel cladding
overhangs floor
edge.

Window side panels

50mm

1. Floor

Prepare a level area for the shed to sit. Join the two floor sections together using 6 x 50mm screws as shown below. Place floor in the prepared area and ensure level.

3. Attaching apex panels

Place an apex panel on top of the back panel, make sure the bottom shiplap board of the apex panel fits correctly into the top Shiplap board of the back panel. Secure by using
8 x 63mm screws, screw up through the top frame of the back panel into the bottom frame of the apex panel. Repeat for front apex panel.

63mm

63mm

63mm

63mm

It is recommended to drill pilot holes in the front and
back panel framing with a 4mm drill bit before
assembly.

Drill

2. Fixing the wall panels together

Position the back panel and the large side panel on the floor as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge.
Ensure square and secure using 3 x 50mm screws, screw through the side panel into the frame of the back panel. In the same way attach the small window panel to the
other end of the back panel as shown. Place the small plain side panel next to the large plain side panel, ensure level and secure them together using 3 x 50mm screws
through the frame of the small panel into the frame of the large panel. Attach the large window panel to the small window panel in the same way. Add the remaining door
end panel to the front and secure in the same way as the back panel.

Important note

To "

VALIDATE

" the guarantee, adequate provision must be

made to ensure ground contact is avoided and air is able to
circulate underneath the building.
Placing the building on a concrete pad or slab base is
acceptable provided that the building is not allowed to sit in
pooled water during wet conditions.
If the building is to sit on soil or grass it 

MUST

be erected on

pressure treated wooden 50mm x 50mm or similar bearers

(These are not supplied in the kit).

Rowlinson Garden Products recommend using pressure
treated bearers with all buildings on any type of base.

It is recommended to drill pilot holes in
the side panel framing with a 4mm drill
bit before assembly.

Drill