Operating Procedures
Rovema VPK Operators Manual
3/2000 VPK REV(B) PANELVIEW 600
7-3
Preparing the Bagmaker
Use the following procedure to prepare the bagmaker to form empty
bags.
To prepare the bagmaker to form empty bags:
1.
Check that the machine is powered up. If it is not, refer to section
6-0, Machine Setup Procedures.
2.
Check that the desired product recipe is loaded. If it is not, refer to
section 6-0, Machine Setup Procedures.
3.
Check that the desired bag length and machine speed are set. If
they are not, refer to section 6-0, Machine Setup Procedures.
4.
From the operations screen, set the HEAT switch to ENABLED to
allow the sealing devices to heat.
5.
From the operations screen, set the FEEDER switch to DISABLED
to prevent product drops during empty bag production.
6.
Check that the sealing temperature for all sealing devices is correct
for the film type.
7.
Check that there are no active warnings or alarms.