background image

DIGITAL GREASE CONTROL VALVE OWNER’S MANUAL

DIGITAL GREASE CONTROL VALVE OWNER’S MANUAL

2. INSTALLATION PROCESS

WARNING: 

To reduce the risk of serious injury, the pressure relief should be done very 

carefully. Follow the 

PRESSURE RELIEF PROCEDURE

 in 

OPERATION INSTRUCTIONS 

section.

WARNING: 

Make sure the whole system is clean before installing/ replacing a new 

control valve. No impurities or contaminant are allowed to enter the control valve.

(1) Installing the new grease control valves

Follow the following steps to clean the grease supplying system before a new control valve is 
installed. (The system also needs cleaning when the grease in the system is polluted). 

. Turn off the check valve before each dispensing point in the system.

. Turn off the check valve close to the grease pump outlet.

. Turn off the check valve in the air line. Lower the air inlet pressure, and then open the air line 

check valve again, so that the grease pump is ready to work.

. Slowly open the check valves close to the grease pump 

outlet and then the check valve to the dispensing point 
to drain the grease to a waste tank. 

. If there are several dispensing points, you need to drain the 

grease at each point, one by one, starting with the furthest 
one from the pump, and ending with the nearest one to the
pump. 

. When installing a new control valve, first apply appropriate 

sealing glue around the male thread of grease supplying 
system, then connect the male thread into the female thread 
of grease inlet of the control valve, and fix them together.

. Turn on all check valves of grease system.

. Press the trigger to drain enough grease to make sure the grease system is completely 

cleaned. See “OPERATION INSTRUCTIONS” section for the control valve operation.

. Repeat steps 

 to 

 for other grease control valves to be installed at each dispensing point 

in the system.

(2) Replacing grease control valve

. Disconnect and take the grease control valve off the system.

. Follow the steps 

 to 

 in “(1) Installing the new grease control valve" section above.

OPERATION INSTRUCTIONS

1. PRESSURE RELIEF PROCEDURE

WARNING:

 Skin injection hazard: The equipment stays pressurized until pressure is 

manually relieved. To reduce the risk of serious injury from pressurized fluid, fluid from the valve 
or splashing fluid, follow this procedure whenever you: 
•  Are instructed to relieve pressure
•  Stop dispensing
•  Check, clean or service any system equipment
•  Install or clean dispensing devices

(1) Pressure relief procedure

. Close the pump air regulator and the bleed-type master air valve.

. Hold a metal part of the dispensing valve firmly to a grounded metal waste container and 

trigger the valve to relieve the fluid pressure.

. Open the air line valve and grease line valve.

. Close the control valve after the pressure is relieved.

4 of 9

(2) Clean the obstruction in the grease system, when any of the following cases occurs: 

. Problem on control valve, flexible hose, rigid tube or manual/auto tip. 

. Pressure can not be relieved enough after above procedures are done. 

. It takes more than 5 seconds to relieve the pressure thoroughly. 

2. LCD DISPLAY

INDICATIONS: See the following displaying illustration 
of the LCD panel.

. Partial register (4 figures with moving comma from 

0.1 to 999.9): Measurement exceeds the maximum 
value will become zero and re-measure.

. Battery condition (Low-power alarm device is built in.)

. Model identification

. Indication of resettable total or total register

. Resettable total or total register (Total register can 

not reset; 7 figures with moving comma from 1 to 99999.9)

. Indication of flow rate mode 

. Indication of unit of measurement of partial (oz, g) 

. Indication of unit of measurement of total (Ib, kg)

3. OPERATIONAL FUNCTIONS

The control valve features two keys (MENU and RESET).

(1) Setting measurement unit

. Press “MENU” and “RESET” simultaneously and hold for about 5 seconds to enter the unit set mode.

. Press "RESET" to select the unit.

. When desired measurement unit is displayed, press “MENU” and hold about 1 second or the 

digit stops blink to quit the setting mode.

(2) Resetting the present total

Press "RESET", full-screen shows. After about 1 second, the display shows “0.0”.

(3) Displaying current correction factor and general total

Press “MENU” and “RESET” simultaneously and hold for 2 seconds. The display shows the 
correction factor and total value.

4. CALIBRATION PROCEDURE

(1) Procedure for entering the correction factor directly 

. Wait for the control valve to go to standby.

. Press the “MENU” key. Keep it pressed until the digit flashes in Zone 

. Press the “RESET” 

key to choose the right digit from 0 to 9. Press the “MENU” key to go the next digit so that the 
Actual Value can be input.

. Make sure the correction factor is right and then press the “MENU” key. Keep it pressed until 

calibration is finished and the factor is saved. The control valve will then return to standby.

(2) Modify the correction factor in field

. Press the “RESET” for 1 second, Zone 

 displays “0.00”. 

. Start dispensing into a container whose weight is known. 

. Stop dispensing when over two-thirds of volume is reached, weigh the container for gross 

weight and minus the tare weight of the container to get the net weight. The weight that is 
displayed on the LCD is the Display Value, not the Actual Value. The net weight of the grease 
is the Actual Value.

. Press the “MENU” key. Keep it pressed until the digit flashes in Zone 

. Then press the 

RESET key to choose the right digit from 0 to 9. Press the “MENU” key to go the next digit so 
that the Actual Value can be input.

. Make sure the Actual Value is input right and then press the “MENU” key. Keep it pressed until 

calibration is finished and the factor is saved. The meter will then return to standby.

5 of 9

1 Grease inlet

2 Trigger

3 Adjustable bolts

4 Grease outlet

Fig. 2 Grease Control Valve

Fig. 3 LCD panel displays region

Reviews: