![rough country 92179500000 Manual Download Page 2](http://html1.mh-extra.com/html/rough-country/92179500000/92179500000_manual_1492038002.webp)
2.
Working from one side to the other, slide the second roof half into the H molding.
Make sure to get the roof
halves tight together.
See Photos 3 & 4.
3.
Place the assembled roof onto the ROPS cage as seen in
Photo 5.
4.
Start with the outside assembly part. Transfer the ¼" hole through the roof with the hand drill one at a time putting in
the supplied ¼"
-
20 x ¾" bolts with a ¼" washer on the top and bottom securing them with the acorn nuts.
See Pho-
tos 6 & 7.
Photo 3
Photo 4
Photo 5
Photo 6
Photo 7
Summary of Contents for 92179500000
Page 4: ......