Introduction/Safety/Installation 11
SG80AII
Manual
www.rottlermfg.com
Unpacking and Lifting:
Carefully uncrate the machine. Remove all tooling from storage compartments and unpack. Locate the
leveling bolts and leveling pads. Clean all surfaces with solvent and rags to remove protective shipping
coatings.
THIS MACHINE IS TOP-HEAVY. Use care when lifting and moving Machine. Approximate shipping
Weight of Machine is 2800 lbs. (1258 kg).
Positioning the Machine:
Lift Machine using a fork lift. Move fork lift to front of Machine and separate forks so they are
visually centered.
Insert forks under front-center of Machine, using care not to damage Foot Pedals Valve or Air
Lines. Tilt forks slightly upward so Machine will lean toward fork lift and lift Machine.
While Machine is on fork lift, install five (6) Leveling Screws and Jam Nuts in holes provided in
bottom of Machine Base. Two (2) Screws installed in rear-corners and one (2) Screw installed in
front and rear -center of Machine Base will serve as Leveling Screws; while two (2) Screws
installed in front-corners of Machine Base will serve only as Support Screws.
Move Machine to desired location and placed leveling bolts over the center hole of the Leveling
Pad. Be certain to allow sufficient clearance to allow access for leveling and also for connecting
air and electrical lines.
Lower machine onto leveling pads making certain that the leveling bolts align into counterbore on
leveling pads.
Be certain nothing interferes with air or electrical lines running from the floating head assembly to
the cabinet.
Determine there is no possibility of air or electrical lines dragging on wall surfaces or adjacent
machinery.
Wipe top Rails with a clean, dry cloth to remove protective shipping oil.
Do not attempt to move the Work Head unless Air Supply is connected, and air valve is turned on and
power has been turn on (make sure the EMERGENCY STOP Button is off). From the touch screen, float
the workhead, spray, and clean surface with (WD40) or similar degreaser and flow the work Head side by
side to remove all the shipping oil from under the work head. (Top Upper surfaces rails should be clean
and free of oil).
Summary of Contents for SG80AII
Page 2: ......
Page 12: ...Introduction Safety Installation 9 SG80AII Manual www rottlermfg com Electrical Enclosure ...
Page 49: ...Machine Parts 7 SG80AII Manual Type text www rottlermfg com Type text Base Assembly ...
Page 52: ...Machine Parts 10 SG80AII Manual Type text www rottlermfg com Type text Spindle Assembly ...
Page 56: ...Machine Parts 14 SG80AII Manual Type text www rottlermfg com Type text Transmission Assembly ...
Page 59: ...Machine Parts 17 SG80AII Manual Type text www rottlermfg com Type text Head Support Assembly ...