Preparing for Operation
Installation
Your E-Z Cutter may be mounted on a bench or on
the E-Z Cutter Stand (#00037) which is available as an
accessory.
Bench Mounting: Ensure that the E-Z Cutter is
mounted on a bench sturdy enough to support the
E-Z Cutter's weight and the pressure generated by
normal cutting operation. The E-Z Cutter should be
bolted solidly to the bench with 1/2" diameter bolts.
Bolt the unit at the approximate location relative to
your pipe support system (see next pages).
E-Z Cutter Stand Mounting: Ensure that the E-Z Cutter
is bolted securely to the stand with 1/2" bolts and that
the machine is placed on a level area and bolted to
the floor with 1/2" studs after you have established
your pipe support system.
Power
Use proper electric current as shown on name plate.
To prevent power loss, extension cord of sufficient
capacity must be used.
To avoid electrical shocks when operating in the field,
connect the ground wire of the extension cord.
Installation of Your
Pipe Support System
Your E-Z Cutter combined with the appropriate
Collins accessories can put your company into
production cutting of pipe and tubing quickly.
16.0"
8.31"
4.91"
17
⁄
32
"
Diameter
Mounting
Holes
E-Z Cutter Stand
Hole Pattern
E-Z Cutter
Hole Pattern
29.0"
16.75"
Power
Cord Length
Wire Size
115 V
Below 50'
12-3
50'-100'
10-3
230 V
Below 50'
14-3
1 Phase
50'-100'
12-3
Pipe
Support
Fitting
E-Z Cutter
Stand
ROLLER
BEARING
SUPPORT
1
1
⁄
4
" Support
Pipe screws
into body of
E-Z Cutter
6
COLLINS E-Z CUTTER
Phone 800-545-7698 • FAX 815-633-0879
www.rothenberger-usa.com