Operations manual AQUASTOP
®
II
14
5.
Installation and wiring :
5.1 Installation
The installation site must provide easy access for
the operator without hazard. Sufficient mechanical
stability must be guaranteed, also secure the device
from slipping on the installation surface. To ease
operation and good visibility of the display, the
handle can be used as a support. To adjust the po-
sition of the handle, unfasten the screws on both
sides of the handle and fasten them again after ad-
justment.
5.2 Wiring of power supply
Before wiring the device, make sure that the main
switch is in position OFF „0“. Herewith, all poles are
disconnected from the mains voltage.
Before wor-
king on the device itself or on an installation
connected to it, the unit must be prevented
against unintentional restart.
This can be done by
retracting the power cable and securing it against
re-connecting.
After having finished the wiring completely, switch
the device on with main switch in position ON „1“.
5.3 Wiring of accessories
Pin assignment of flow
meter with integrated
temperature sensor