
Installation Instructions ROTARY inground lifts SL230/SL235/SL2
50 • Release: 11/2013 • Page 15
Fig. 15 Middle piece of synchronization mechanism
6.4 Arrange cylinders
Drive up cylinders to appr. 80 cm. Control both cylinders by using a spirit level if they are perpendicular. Where
appropriate, underlay the basic executions with suitable metal strips. For this purpose, remove the screws of the
basic execution and hoist it approx. 10 cm. After underlaying the metal strips screw together the basic executions
and control again if it is perpendicular. If necessary repeat this process several times.
With the models SL235BR and SL250BR-RA we strongly recommend to mount
the two
cylinders slightly outwards! We recommend about 2-3 cm outwards at the top of the cylinders when lifted
completely.
6.5 Installation of the cover and sealing
Remove the plastic foil from the surface of the cover. Put the cover carefully between the basic guides and take
care that the cover bears on completely.
Then seal the lift between the cassettes´ frame and the basic guides resp. the cover using the profiled rubber.
Additionally tighten the profiled rubbers at their ends using silicone.
Summary of Contents for SL230RA-PE
Page 25: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 25 ...
Page 26: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 26 ...
Page 27: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 27 ...
Page 28: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 28 ...
Page 29: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 29 ...
Page 30: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 30 ...