![Ross Synergy 2 SD Installation Manual Download Page 89](http://html1.mh-extra.com/html/ross/synergy-2-sd/synergy-2-sd_installation-manual_1489028089.webp)
Synergy Series Installation Guide (v18)
Preliminary Cabling and Check • 3–1
Preliminary Cabling and Check
In This Chapter
This chapter outlines procedures for making basic control panel, frame, reference, and monitor
connections. A preliminary functional check procedure is also provided. The following topics are
discussed:
•
•
•
•
•
•
Animated Logo Generator (CDK-111A-M) Cabling
•
•
•
•
•
•
•
•
Summary of Contents for Synergy 2 SD
Page 1: ...Ross Video Limited Installation Guide Volume I Software Issue 18...
Page 10: ......
Page 18: ...viii Contents Synergy Series Installation Guide v18...
Page 88: ...2 44 Installation Synergy Series Installation Guide v18...
Page 122: ...4 18 Preliminary Video Installation Synergy Series Installation Guide v18...
Page 132: ...5 10 Using the Menu System Synergy Series Installation Guide v18...
Page 156: ...6 24 BNC Configuration and Check Synergy Series Installation Guide v18...
Page 292: ...9 62 Additional Installation Setups Synergy Series Installation Guide v18...
Page 326: ...11 10 Still Stores Synergy Series Installation Guide v18...
Page 346: ...12 20 Editors OverDrive Synergy Series Installation Guide v18...
Page 394: ...GL 4 Glossary of Terms Synergy Series Installation Guide v18...