![Ross Synergy 1 Maintenance Manual Download Page 166](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025166.webp)
9–24 • Calibration and Diagnostics
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Diagnostic Tools – Synergy 100
The Synergy 100 switcher provides a full array of control panel diagnostics tools:
•
•
•
•
•
Communication Port Monitoring
Each panel diagnostic function is discussed in the following sections.
Potentiometer Test
The
Potentiometer Test
allows you to test the response of all potentiometers (knobs) on the Synergy
100 control panel.
Use the following procedure to test the potentiometers (knobs) on the panel:
1. Press and hold down the following three buttons at once:
•
SEL
in the
Effects Control
Group
•
SEL
in the
Mattes
Group
•
SEL
in the
System Control
Group
A message will scroll across the 3 four-character displays in the
Effects Control
,
Mattes
, and
System Control
groups. The message advises you that the control panel is
in Diagnostic Mode. This message will continue to scroll until a knob, button, the fader,
or the joystick is disturbed.
2. Test the knobs on the Synergy 100 control panel as follows:
•
Rotate the knob you want to test fully counter-clockwise. The zinger next to the
fader will decrease until none of the segments are lit.
•
Rotate the knob you want to test fully clockwise. The zinger next to the fader will
increase until all of the segments are lit.
3. Verify the information that is displayed in the 3 four-character displays as follows:
•
In the
Effects Control
Group
,
Knob
appears in the display.
•
In the
Mattes
Group
, a range of numerical values appears in the display.
•
In the
System Control
Group
, the name and location of the knob appears in the
display. For example,
Dgan
for the
GAIN
knob in the
Downstream Keyer
Group
.
In addition, the LEDs in the
Transition Progress Bar
will light.
Important
Do not open the Synergy 100 control panel without express
instructions from Ross Video Technical Support.
Note
The name of the knob being tested will be displayed in the
System
Control Area
of the display.
Summary of Contents for Synergy 1
Page 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Page 10: ......
Page 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Page 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...