All work on the appliances must be carried out by qualified personnel.
For maintenance, moving, installation and cleaning of the appliance use suitable
prevention and protection equipment (gloves, etc.).
Lifting and moving of appliances weighing more than 25 kg must be carried out using
proper equipment, or by two persons, in order to avoid risks or injuries.
2
5
If the cord is damaged, replace it right away as follows:
-
Open the terminal box cover, remove the power cord and replace it with one
having the same characteristics and suitable for the appliance's load.
-
This operation must be carried out by a qualified technician.
-
The earth wire (yellow/green) must absolutely be about 10 mm longer than the
power line wires.
Attention:
should it be necessary to replace the supply cord, connect the wire in accordance with
the following colours/codes:
BLUE - NEUTRAL (N)
BROWN - LIVE (L)
YELLOW-GREEN - EARTH ( )
Preparation of the oven and pre-use
Attention: the oven must be unplugged from the electrical mains. Before using the oven,
carefully clean the interior, the racks and the drip pan with non-abrasive soap and
lukewarm water. Insert the racks and the drip pan into their respective runners. When this
operation is complete, plug the oven into the electrical mains and bring it up to maximum
temperature for at least 20 minutes in order to eliminate any residual grease, oil or resins
from manufacturing which may cause unpleasant odours during cooking; then ventilate
the room.
After completing this simple operation, the oven is ready to cook for the first time.
Summary of Contents for RFE9163/1MIN
Page 1: ...Mod RFE9163 1MIN ...
Page 2: ......
Page 4: ......
Page 20: ...Tav 480 856 897 545 471 24 860 550 min 90 475 SCHEMA INCASSO 18 ...
Page 24: ...22 ...
Page 38: ...Tav 480 856 897 545 471 24 860 550 min 90 475 INSTALLATION SCHEME 36 ...
Page 40: ...38 ...
Page 42: ...40 ...
Page 58: ...Tav 480 856 897 545 471 24 860 550 min 90 475 EINBAUSCHEMA 56 ...
Page 60: ...58 ...
Page 62: ...60 ...
Page 76: ...Tav 480 856 897 545 471 24 860 550 min 90 475 ESQUEMA EMPOTRAMIENTO 74 ...
Page 78: ...76 ...
Page 80: ...78 ...
Page 95: ...Tav 480 856 897 545 471 24 860 550 min 90 475 SCHEMA D ENCASTREMENT 93 ...
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...12300138410 ...