Tasting Niche Dia. With Indiv.
5
Step 6
Attaching to the wall
Fasten to the wall through the back cross pieces using #8x3 “ screws and
using a level to make sure rack is mounted square on the wall. Make sure
back cross piece has ” dia pilot holes drilled before screwing to wall.
For a professional looking job you can use a nail set to indent the nail
heads and wood filler to fill in the nail holes on the front cleats, baseboard
and crown moulding. Give the part that was filled a light sanding with 180
grit sandpaper.
3
32
Crown moulding
attached to top of rack
1
2
1
baseboard attached
to bottom of rack
1
4
3
Step 5
Installing diamond bin inserts.
Place diamond bin inserts into each opening as shown.
Apr/23/2012
Toll Free: 1-888-253-6807
www.RosehillWineCellars.com
6ft Premier Cru
Kit Rack