10-00328 REV C
8
7 INSTALLATION AND OPERATION
When you receive your Q-LED II, carefully unpack it and inspect all components.
Please contact the factory immediately if damage has occurred during shipping.
7.1 OPERATIONAL CHECK
After unpacking your Q-LED II, a brief operational check should be made prior to
installation of the unit. The following procedure is recommended:
1.
Place the light on a table with the connector up.
2.
Make sure controller or power source is turned off.
3.
Apply a small amount of silicone spray lubricant to the mating connector
and carefully attach it to the bulkhead connector.
4.
Apply 120VAC 50/60Hz power and observe the lamp emit light.
5.
If you notice any issues with the functionality of the light, please contact
the factory immediately.
CAUTION:
Do not look directly at the light. The light output from
the array is powerful enough to cause pain and/or damage to the
eyes.
CONN
ECT
OR
QLED-II 10-00325-
01
1 PIN , IERD2M-BC-4
02
2 PIN, IESQ4M-BC-1
03
5507-1503
04
XSG-3-BCL-HP-SS
05
LPBH-3-MP
06
BH-3-MP W/LOCK SLV
07
MSAJ-3-BCR
08
DELETED
09
DELETED
10
DELETED
11
CRE/SEACON MSAJ-3-BCR
12
MCBH-4-MP-1/2"
13
RMG-3-BCL-SS
14
LPBH-3-MP-SS-1/2”
CS
CUSTOMER SPECIFIED
-14
LPBH-3M-SS-
1/2”
ROS# 60-01180-4
1
= Load
2 = Neutral
3 = Earth Ground