Galaxy HDX4 RAID Quick Install Guide
-
14 -
Contact Rorke Tech Support 800 328 8147
Power on procedure.
•
Make sure all the hardware components are properly installed.
•
Power on all switches and networking devices.
•
Power on all Galaxy JBOD enclosures by turning on the PSU power switches.
•
Power on the Galaxy RAID enclosures by turning on the PSU power switches
•
Power on the hosts servers or application stations.
•
Check all the component LEDs. No drive, power, or fault LEDs, red or amber,
should be lit. The front panel of the Galaxy RAID should not have the ATTN LED
on, and will display the product number, ie GX4 –xxxxx along with a message
that says “Ready”.
Power off procedure.
Before you power off the Galaxy, The reverse of the steps to power on should be used to
power off the Galaxy RAID.
NOTE: ALL JBODS MUST STAY POWERED ‘ O N ‘ WHILE YOU POWER OFF THE GALAXY
RAID. ONCE THE RAID IS POWERED OFF, THEN POWER OFF THE JBODS! FAILURE TO DO
THIS MAY RESULT IN CORRUPT OR LOST DATA!
Status Indicators: Front of Enclosure
Observe the front of the Galaxy and verify the indicators below. If they are different or if
you hear an audible alarm, contact Rorke Tech Support at 800 328 8147.
LCD PANEL
LCD PANEL
PWR LED
ON [ BLUE]
OFF