© ROPOX 2016
Page 23
8.
Performance test
After installation and prior to use all functions of unit must be tested. The test must be carried
out by competent personnel. Subsequently the test shall be carried out once a year.
Testing prior to connection to mains voltage:
1. Check that mounting instructions have been observed
2. Check that all bolts have been tightened.
3. Check that all cables have been connected correctly and that the plugs have been
pressed home.
4. Check that there is no load on the frame.
5. Check that there is nothing preventing the frame from moving freely within the
heightadjustment range.
Start-up Procedure
1. Connect the net cable and turn on the power
2. Connect the motor cables to M1 and M2
3. Connect the control switch to HS
4. Press DOWN on the control switch, move the frame to bottom position, check that the
movement is even and smooth. Make sure that the cable connections follow the
movement of the frame and that they do not get squeezed. The frame is now reset.
5. Press UP on the control switch, move the frame to top position and check that the
movement is even and smooth. Make sure that the cable connections follow the
movement of the frame and that they do not get squeezed.
If safety stop has been mounted under the wall unit it must be tested as follows:
Press DOWN on control switch and let frame move 2-5cm / 1-2in downwards together
with safety stop. The frame must stop downwards movement and move 1-2 cm/ 1in
upwards and stop.
If a smart box has been mounted
– (is used if a FlexiElectric has been mounted below
this unit) follow additional instructions for smart box.
If all test are ok, the frame is ready for use. See section
“Safety in use”.