7. Performance test
After completed installation and before use all functions of the module must be tested. After that
a performance test must be carried out at least once a year by competent personnel.
1. Check that the mounting instructions have been observed.
2. Check that all bolts and screws have been tightened.
3. Check that all cables have been correctly connected and that the plugs have been pressed
all the way in
4. There must be no load on the unit.
5. There must be no objects preventing the frame from moving freely within the range of height
adjustment.
Start-up procedure
1. Connect the net cable and turn on the power
2. Connect the motor cables to M1
3. Connect the control switch to HS
4. Press UP on the control switch, move the frame to top position, check that the movement is
even and smooth. The frame is now reset.
5. Press DOWN on the control switch, move the frame to buttom position and check that the
movement is even and smooth.
The safety stops must be tested:
Lower safety stop:
Press the DOWN button and let the cupboard move 2-5 cm downwards,
and activate the safety stop. The unit must now stop the downward movement, move 1-2 cm
upward and stop.
Upper safety stop:
Press the UP button and let the cupboard move 2-5cm upwards, and
activate the safety stop. The unit must now stop the upward movement, move 1-2 cm
downwards and stop.
When all these tests have been carried out successfully, the unit is ready for use.