Chargepoint Installation Completion
SecuriCharge Intelligent EV Charging Unit
EVSM-V01-R1 Installation and Operation Manual
Page
27
of
33
December 2022
Chargepoint Installation Completion
1. Make sure the…
x
Chargepoint is secured to the mounting location.
x
Chargepoint enclosure is free of debris.
x
Cables entering the chargepoint are secure.
2. Make sure the electrical installation is complete:
x
Incoming cables are connected to the relevant devices within the enclosure.
x
All electrical connection points are secure.
x
All required tests have been performed – in accordance with the current
legislation applicable in the geographical region of the installation.
x
Make sure the chargepoint has been installed in compliance with the current
Electrical Wiring Regulations (including recommended earthing arrangements).
3. Fit the fascia panel(s) to the enclosure and secure with the fixings removed at the
start of the procedure.
Figure 17 Fascia Panel Fasteners
x
Make sure the rubber washer on the fixing
is in good condition and is correctly
placed between the fascia and the
washer.
x
Slight compression of the rubber washer
helps to maintain the water resistance of
the pedestal.
x
Do NOT over tighten the fixings.
NOTE:
Copper grease or a similar anti-seize
compound may be applied to screw threads
to ensure ease of fastener removal in the
future.
4. If required, remove any handling marks from the enclosure with a soft, damp cloth.
5. Make sure this manual is given to the Owner/Host before leaving the site.
Rubber
Steel
r