
20
1. Installation
Emplacement and Installation Operations
Emplacement and installation of the machine are to be carried out by a service technician.
WARNING
Never attempt to perform operations such as installation or relocation yourself.
This machine weighs approx. 455 kg (up to approx. 600 kg (1350 lb.), including media and the
like), and moving it requires special equipment and training. Performing operations in an unrea-
sonable manner may result in a major accident.
WARNING
After installation, keep the stand secured in place using the adjusters.
This machine weighs approximately 455 kg (up to approx. 600 kg (1350 lb.), including media
and the like). If the machine should begin to topple, the tipover cannot be stopped with human
strength, and a major accident may result, including crushing of the appendages or the body.
Adjusters
Summary of Contents for SolJet Pro II SJ-1000
Page 4: ...2...
Page 5: ...3 To Ensure Safe Use...
Page 12: ...10...
Page 13: ...11 Pour utiliser en toute s curit...
Page 20: ...18...
Page 21: ...19 Setup Guide...
Page 37: ...35...
Page 38: ...36...
Page 39: ...R2 040617...