21
3 Replacement of Main Parts
3
5
Remove the DRIVE PULLEY from the MOTOR BASE.
6
Loosen the 4 screws and pull out the CARRIAGE WIRE and
replace it with new one.
SCREWS
CARRIAGE WIRE
7
Fix the DRIVE PULLEY to the MOTOR BASE by aligning it
against the SHAFT STAY.
8
Fix the CARRIAGE MOTOR by checking the backlash.
DRIVE PULLEY
DRIVE PULLEY
CARRIAGE MOTOR
Summary of Contents for CAMM-1 PRO CM-300
Page 4: ... MEMO ...
Page 6: ...2 1 Structure Spare Parts 1 1 2 FRAME ...
Page 28: ...24 3 Replacement of Main Parts 3 MEMO ...
Page 62: ......
Page 63: ...CM 500 400 300 ...