Putting the Analyzer into Operation
R&S
®
ZND
11
Getting Started 1316.2407.02 ─ 52
3
Putting the Analyzer into Operation
This section describes the basic steps to be taken when setting up the analyzer for the
first time.
Simple measurement examples are provided in
Chapter 6, "Performing Measure-
on page 54; for a description of the operating concept refer to
on page 28. For all background and reference informa-
tion concerning manual and remote control of the instrument, refer to your analyzer's
help system or user manual. A more detailed description of the hardware connectors
and interfaces is also part of the help system or user manual.
Risk of injury due to disregarding safety information
Observe the information on appropriate operating conditions provided in the data sheet
to prevent personal injury or damage to the instrument. Read and observe the basic
safety instructions provided with the instrument, in addition to the safety instructions in
the following sections. In particular:
●
Do not open the instrument casing.
3.1
Unpacking and Checking the Instrument
Check the equipment for completeness using the delivery note and the accessory lists
for the various items. If you notice any damage, immediately contact the carrier who
delivered the instrument.
Packing material
Retain the original packing material. If the instrument needs to be transported or ship-
ped later, you can use the material to protect the control elements and connectors.
Risk of injury during transportation
The carrying handles at the front and side of the casing are designed to lift or carry the
instrument. Do not apply excessive force to the handles. If a handle is ripped off, the
falling instrument can cause injury.
3.2
Positioning the Instrument
The network analyzer is designed for use under laboratory conditions, either on a
bench top or in a rack.
Positioning the Instrument