GUI Reference
R&S
®
ZNB/ZNBT
306
User Manual 1173.9163.02 ─ 38
These buttons are only shown if more than 4 ports are available.
Step 2: Connections
Defines the port assignment(s) between the R&S
ZNB/ZNBT and the calibration unit.
Related information
Refer to
Chapter 4.5.5.4, "Multiple Port Assignments"
on page 164 for details on multi-
ple port assignments
The layout of the main panel depends on the number of test ports available.
Figure 5-19: Multiple port assignments
Similar functionality as for the "SingleCal" version of the wizard (see
on page 296): select the adequate calibration in the "Cal Type"/"Ports" table to
display and edit the corresponding port asssignment(s).
Start
.
If the configured port assignments are invalid, this action is disabled.
Step 3: SMARTerCal
In the final step the R&S
ZNB/ZNBT displays a "SMARTerCal" screen that guides the
user through the calibration data acquisition.
Cal Softtool