Preparing for use
R&S
®
NRP Series
18
Getting Started 1419.0170.02 ─ 18
●
1 R&S
NRP
‑
ZK6 cable per power sensor
●
R&S
NRP
‑
Z5 sensor hub with external power supply unit and USB cable
●
BNC cables to connect the trigger input and trigger output signals (optional)
Setup
1
2
3
4
8
9
7
6
5
NRP
3-P
ath
Dio
de P
ow
er
Sensor
MHz t
o G
Hz
, 100 pW t
o 200 mW
(−
70
dBm t
o +23 dBm)
SMA
RT S
EN
SOR TE
CHNOL
OG
Y
Figure 3-2: Setup with an R&S NRP-Z5 sensor hub
1 = External power supply unit
2 = Connect to AC power supply.
3 = Connect to computer with USB host interface.
4 = Optional: Connect to trigger source.
5 = Optional: Connect to triggered device.
6 = R&S
NRP
‑
Z5 sensor hub
7 = Signal source (DUT)
8 = R&S NRP power sensor
9 = R&S
NRP
‑
ZK6 cable
Set up as shown in
1. Connect the R&S
NRP
‑
ZK6 cable to the power sensor. See
cable to the host interface of the power sensor"
Connecting to a controlling host