Preparing for use
R&S
®
HMP Series
16
Getting Started 1178.6791.02 ─ 03
4
Preparing for use
Here, you can find basic information about setting up the product for the first time.
4.1
Lifting and carrying
See
"Lifting and carrying the product"
For mounting the R&S
4.2
Unpacking and checking
1. Unpack the product carefully.
2. Retain the original packing material. Use it when transporting or shipping the
product later.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact
Rohde
&
Schwarz.
4.3
Choosing the operating site
Specific operating conditions ensure proper operation and avoid damage to the
product and connected devices. For information on environmental conditions
such as ambient temperature and humidity, see the data sheet.
See also
Choosing the operating site