6
Maintenance
Frequently check to see that all bolts are securely fastened.
Touch up paint may be used to cover scratches or blemishes sustained through use.
Field equipment should be washed periodically with soapy water to maintain original surface
finish.
A silicone based lubricant may be used on moving parts to maintain proper function.
Replace any damaged equipment with genuine Rogers Athletic parts.
Failure to do so may result
in unsafe equipment and/or personal injury.
For 2 man sleds:
Lay Iso Runner Sub Assembly on its side. Connect the runner to the connection link
and then stand runner upright to connect the next sled runner. See steps 3 & 4 for ram unit and pad
installation. Hardware used for the Connection Links is (4) 5/8” x 6” bolts, (4) 5/8” nuts, and (8) 5/8”
washers per Iso Runner Sub Assembly.
5
WARNING!
READ AND UNDERSTAND ALL MAINTENANCE PROCEDURES.
Failure to follow all procedures listed below may cause serious injury and/or a
decrease in equipment functionality.