background image

CPR32-SE-BRD v3.0 User Manual

 

2020-10-08 

 

 

9/15 

 

3.6 Installation guidelines 

 

Install device  in such way  as to ensure easy access to screw terminals, RST button and  FDM 
jumper. 

 

 All electric connections must be made with power supply switched off. 

 

 All devices connected to the same communication  bus (RS485 and RACS CLK/DTA) should be 
connected to the same negative potential (GND). In order to satisfy this requirement connect 

the power supply according to section 3.3 Power supply. 

4.

 

C

ONFIGURATION

 

4.1 Configuration by means of PR Master software 

After installation of access control subsystem with RS485 communication bus  including connected 
access controllers, CPR32-SE-BRD network controller and communication interface (e.g. UT-2USB), 
the  installer  can  proceed  with  installation  and  configuration  of  PR  Master  software.  At  first  it  is 
necessary  to  configure  subsystem  selecting  the  option 

Networks

  in  the  main  window  of  PR 

Master software and then the button 

Add

. In the newly opened window shown in fig. 6 select the 

option 

Network equipped with CPR32-SE or CPR32-NET unit

 and communication port 

from  the  list.  By  default  the  next  step  consists  in  detection  of  controllers  on  RS485  bus  which 
requires selection of 

Controllers

 button and then 

Add

 button in 

Networks

 window. When all 

opened windows are closed, CPR32-SE-BRD device shall be listed in the main window of PR Master 

software – see fig. 7 
 

 

Fig. 6 Network properties window 

Summary of Contents for CPR32-SE-BRD

Page 1: ...version 3 0 5133 or newer Hardware version 3 0 Document version Rev B 2016 ROGER sp z o o sp k All rights reserved This document is subject to the Terms of Use in their current version published at th...

Page 2: ...3 3 Power supply 6 3 4 Communication with CPR 8 3 5 Input and output lines 8 3 5 1 Inputs 8 3 5 2 Relay outputs 8 3 5 3 General purpose outputs 8 3 6 Installation guidelines 9 4 Configuration 9 4 1 C...

Page 3: ...erns PRxx1 series controllers The network controller is equipped with RS485 port which is used for direct communication with access controllers and for communication with computer PR Master software u...

Page 4: ...IN8 input line P2 Power supply for CPR IO1 IO1 output line COM REL1 relay common terminal IO2 IO2 output line NC REL1 relay output NC IN1 IN1 input line NO REL1 relay output NO IN2 IN2 input line CLK...

Page 5: ...CPR32 SE BRD v3 0 User Manual 2020 10 08 5 15 Fig 2 Typical connection diagram for CPR32 SE BRD v3 0 network controller...

Page 6: ...roller is designed for power supply from 230VAC 18VAC transformer with minimal power output 25VA but it can also be supplied with 12VDC The connection of power supply is shown in fig 4 and fig 5 If CP...

Page 7: ...CPR32 SE BRD v3 0 User Manual 2020 10 08 7 15 Fig 4 CPR32 SE BRD v3 0 and PR402DR PR411DR controllers supplied with 18VAC Fig 5 CPR32 SE BRD v3 0 and PRxx1 PRxx2 series controllers supplied with 12VDC...

Page 8: ...istors terminators connected at the ends of transmitting lines are not required In most cases communication works with any cable type standard telephone cable shielded or unshielded twisted pair etc b...

Page 9: ...n bus including connected access controllers CPR32 SE BRD network controller and communication interface e g UT 2USB the installer can proceed with installation and configuration of PR Master software...

Page 10: ...CPR off and on Menu Settings Inputs Outputs In the window opened by means of this option it is possible to assign functions to CPR32 SE BRD inputs and outputs Additionally in case of inputs the admin...

Page 11: ...ed at all controllers doors within subsystem network 12 Clear all alarms in subsystem ON monitored When the input is activated then all alarms in CPR32 SE BRD and controllers within particular subsyst...

Page 12: ...es controllers within the subsystem network 73 Alarm in CPR The output is activated for 3 minutes if Tamper Alarm or Power supply alarm is raised The function 67 operates as a sum of 81 and 82 functio...

Page 13: ...ut is activated for 3 minutes when the event memory buffer is filled in 75 90 Low battery 3 min The output remains activated for 3 minutes if charge level of backup battery connected to CPR32 SE BRD u...

Page 14: ...d with CPR32 SE BRD network controller connected to PC through such serial interfaces as UT 2USB RUD 1 or UT 4 with virtual serial port then CPR is erroneously detected by Windows as Microsoft Serial...

Page 15: ...have a negative impact on the environment and health The user is obliged to deliver equipment to the designated collection points of electric and electronic waste For detailed information on recycling...

Reviews: