EVISION - HD101 & HD102
www.roevisual.com
V1.13,
2020-05-20 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved.
27
/
41
6.13.1
HD101 Hot Backup Steps
A.
Connect tiles to port1 from tile matrix’s beginning, keeping port2 disconnected;
B.
Setup mapping for port1;
C.
Save settings for port1;
D.
Disconnect tiles from port1 and connect tiles to port2 from tile matrix’s ending;
E.
Setup mapping for port2;
F.
Save settings for port2;
G.
Reconnect tile to port1, keeping port2 also connected;
H.
Hot backup established.
6.13.2
HD102 Hot Backup Steps
A.
Connect tiles to port1 & port2;
B.
Enable
Backup Port
option for port2;
C.
Setup mapping for port 1 & port2;
D.
Save settings for port1 & port2;
E.
Hot backup established.
By enabling the
Backup Port
option, the specific port will be identified as a backup port. In the above case,
tiles will switch to port2 (backup port) when port1 (primary port) is down and switch back to port1
(primary) once it is back online.
If not enabled the option, tiles will stay port2 after switching, even port1 is back.