Plux
22
72183
72184
19
19
Starting locomotive operation
▪
Prior to initial commissioning
In order to prevent poor running characteristics or damage from occurring, the coupling rod
bearings on your locomotive must be oiled prior to undertaking the initial commissioning. We
recommend using the ROCO oiler 10906
▪
Running the model in
Before use advisable to let the loco go around about 30 forwards and 30 minutes backwards
without load, to obtain an optimal circuit and best tractive power
▪
Operating instructions
Only for showcase
The smallest radius this model should run is
R2 (358 mm) of the ROCO track system (mo-
del without tubes protecting pistons). Your
locomotive will run smoothly on clean tracks
only. For this purpose we recommend using
item no.
46400, Roco track cleaning van,
or item no.
10002, Roco track cleaning
rubber,
for removing heavy dirt.
19
8072183920.indd 19
07.11.2017 10:32:29