Install Transverse Straight Rails
Use this procedure to install transverse straight rails.
Before You Begin
What You Need
• M5 x 0.8 x 20 mm low head socket cap screws, as required
• A straight rail segment
• 4 mm hex driver
• Loctite 243
• Three transverse rail-to-track alignment clamps, from the 2198T-A04
iTRAK TriMax rail aligning tool kit
To install a transverse straight rail, complete these steps.
1. Clamp transverse rail to top plate by using three transverse rail-to-track
alignment clamps as shown.
2. Check that the rail end faces are flush with adjacent rails.
3. Apply Loctite 243 to the M5 x 0.8 x 20 mm LHCS rail screws, as
required.
4. Install M5 x 20 low-head socket cap screws from left to right and torque
to 9 N•m (6.6 lb•ft).
Do not install left most screw.
5. After each sets of three screws are installed, move left most clamp to the
next set of three screws. Do not install right most screw.
6. If addition straight transverse rails are to be installed, repeat steps
.
ATTENTION:
Before attempting any service to an iTRAK system. See
M5 x 20 LHCS
Transverse Rail-to-track
Alignment Clamps
Transverse Rail
Summary of Contents for iTRAK
Page 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Page 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Page 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Page 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Page 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Page 123: ......