Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
43
Track Installation
Chapter 2
Figure 18 - Mounting Dimensions and Clearance
Wire Lubrication Pump
Connect the power cable the 24V I/O port of your controller.
An initial coating of oil is required on the entire track before operating the
iTRAK and auto lubrication systems.
Lubrication Pump Configuration
to make tube connections, initial lubrication, and
lubrication during normal operation.
372.5
(14.65)
326
(12.8)
287
(11.3)
45.4
(1.79)
108
(4.25)
108
(4.25)
108
(4.25)
95.25
(3.750)
127.0
(5.02)
6.35
(0.250)
102
(4.0)
33
(1.3)
89
(3.50)
63.5
(2.50)
Ø 62
(Ø 2.5)
5.0 m (16.4)
22.0 mm (0.87)
108
(4.25)
Minimum static
bend radius
Power Cable Length
Plug (X3)
Minimum
Clearance
Elbow
Fitting (X3)
Straight
Fitting (X3)
Minimum
Clearance
Minimum
Clearance
Minimum
Clearance
1
2
3
4
BROWN
WHITE
BLUE
BLACK
1
2
3
4
+24V
Not Used
GND
Not Used
M8
Connector
IMPORTANT
The mover cams distribute the oil on the track. The movers must be in
motion when the pump is activated, otherwise the oil drips away.
Table 14 - Recommend Lubrication Pump Setting
Feature
Setting
Mode
Impulse
Summary of Contents for iTRAK
Page 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Page 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Page 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Page 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Page 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Page 123: ......