16
Rockwell Automation Publication 750-IN115B-EN-P - March 2020
PowerFlex 755T Frames 5 and 6 EMC C2 Filter Kits
13. Follow these steps to install the 90° fittings on the flexible conduit (see 90° Conduit Fitting Parts for reference):
a. Remove the gland nut, seal ring, and ground ferrule from the fitting body.
b. Place the gland nut onto the end of the flexible conduit.
c. Place the seal ring onto the end of the flexible conduit.
d. Thread the ground ferrule into the end of the flexible conduit.
e. With the flexible conduit fully threaded onto the ground ferrule, place the seal ring tightly against the ground ferrule.
f. Place the end of the ground ferrule and flexible conduit into the fitting body.
g. Thread the gland nut onto the fitting body and tighten the gland nut.
h. Repeat steps a…g to install the second 90° angle to the first fitting.
90° Conduit Fitting Parts
14. Route the power and ground cables through the flexible conduit and 90° fittings. Allow approximately 350 mm (13.8 in.) of cable length
between the drive connections end to the 90° fitting.
Gland Nut
Seal Ring
Ground Ferrule
Fitting Body
Seal Washer
Locknut
Insulated Throat
90° Fitting Installed on Flexible Conduit
Flexible Conduit
Drive End Power and
Ground Connections
EMC C2 Filter End
Power and Ground
Connections
Approximately
350 mm (13.8 in.)