Rockwell Automation Publication LDAT-UM001A-EN-P - April 2016
59
Maintenance
Chapter 5
4.
Torque screws to values shown in the table starting from the center screw
and alternating to each side.
5.
Slide one bearing puck on to the bearing rail.
Remove Strip Cover
Use this procedure in reverse to install a strip cover only on linear thruster
originally equipped with one.
Refer to this figure when removing the strip cover.
Bearing Screw Size
Torque
N•m (lb•ft)
M3
0.9 (0.67)
M4
1.7 (1.25)
M5
4.5 (3.33)
M6
6.8 (5.00)
M7
14.7 (10.83)
IMPORTANT
Bearing pucks for the frame 30 linear thruster do not have retained
ball bearings. Leave the plastic bearing retainer in place until you are
ready to assemble the puck to the rail. To assemble the frame 30
bearing pucks, do the following.
a. Butt the plastic retainer against end of the rail.
b. Slide the bearing from the retainer to the rail.
Item
Description
Item
Description
1
Stator cover
4
End clamp
2
Stator cover low friction tape
5
Slider cover
3
Stator body low friction tape
Top View of
LDAT-Series Integrated
Linear Thruster
(LDAT-S73010
xx
is shown)
1
2
4
5
3
4