Maintenance
Chapter 5
Vertical Adjustment
1. Loosen the two tapties that mount the L-bracket to the base.
2. Move the L-bracket up and down as required.
3. Secure the adjusted position of auxiliary by tightening the two M6
taptie.
Figure 42 - Auxiliary Contacts Adjustment
Earthing Switch Auxiliary Contacts Inspection
Operation of electrical auxiliaries must be validated on a yearly basis.
Refer to the unit electrical drawing to determine the test locations on the
terminals located in the low voltage compartment.
IMPORTANT
Auxiliaries must be tested electrically with control power off.
Summary of Contents for Allen-Bradley 7712
Page 6: ...6 Rockwell Automation Publication 7712 UM001D EN P October 2017 Table of Contents Notes ...
Page 10: ...10 Rockwell Automation Publication 7712 UM001D EN P October 2017 Preface Notes ...
Page 24: ...24 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Page 25: ...Rockwell Automation Publication 7712 UM001D EN P October 2017 25 Start up Procedure Chapter 3 ...
Page 26: ...26 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Page 58: ...58 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 5 Maintenance Notes ...
Page 73: ......