14
R9V
Operation has to be carried out
when the machine is off and cold.
Before handling:
■ Disconnect the power supply cable.
■ Disconnect the water supply.
Once the Machine is placed in the new instal-
lation area, reconnect the power supply cable
and the water pipe. (see cap. 6.2 e 6.3) .
The handling means used must be in per-
fect working conditions (see cap 5.2)
2.2.1 Machine movement
installed
MACHINE
UNDER
MAINTENANCE
i
3
- DESCRIPTION OF THE
MACHINE
The machines have been designed and man-
ufactured to be used to make espresso coffee
and hot beverages (tea, cappuccino, etc.).
Any other use is to be considered unsuitable
and therefore dangerous.
The manufacturer cannot be
held responsible for any damage
caused to people or things due
to unsuitable, erroneous or irra-
tional use of the machine
The operator must always follow the indica-
tions contained in this manual. In the case
of a failure or if the machine is not working
properly, switch it off and do not attempt any
direct repair. Contact the service center.
3.1 Designated use
MACHINE
UNDER
MAINTENANCE
i
3.2 R9V technical specifica-
tions
Features
■ Programmable pressure profile system
■ Digital touch display
■ Brew boiler capacity:
1,9 litre - 1200 W
■ Service boiler capacity:
3,6 litre - 1400 W
■ Water source option:
Hard plumbing
■ Wattage: 1600 W
■ Five pump pressure pr one semi
automatic profile
■ Permanent magnets volumetric pump.
Dimensions and weight
(fig_
3.1
)
■ 2GR = 834 x 521 x 643
mm
■ 3GR = 1055 x 521 x 643
mm
(
A
-width x
B
-height x
C
-depth)
■ Weight: 105 kg (R9V 2GR)
120 kg (R9V 3GR)
Summary of Contents for R9V Series
Page 1: ...R9V EN PROFESSIONAL COFFEE MACHINE Use and maintenance manual Original instructions...
Page 2: ......
Page 38: ...R9V Note...
Page 39: ......