background image

31

(The following declaration is applicable for machines distributed in the European Community only)

Declaration of CE conformity

Manufacturer: 

Rocket Espresso Limited Italian Branch

 

Viale Delle Industrie 26 

20090 Settala 

Milano 

Italy

This is to confirm that the Giotto series of espresso machines has been manufactured according to the following 

standards:

DIR. 89/336

s %. 

s %.   

s %.   

s %. 

DIR. 73/23

s %. 

s %. 

DIR. 89/392

s %. 

s %. 

Summary of Contents for Cellini

Page 1: ......

Page 2: ...t up 11 Operating instructions 15 Dispensing steam 18 Dispensing hot water 19 How to make great espresso 21 How to texture milk 22 How to clean your Giotto Cellini 24 How to disassemble dismantle the machine 26 Espresso glossary and recipes 28 Trouble shooting 29 For European Community countries declaration of CE conformity 32 Subject to change without notice ...

Page 3: ...3 General data Manufacturer Rocket Espresso Limited Viale Delle Industrie 26 20090 Settala Milano Italy Email info rocket espresso com Model Giotto and Cellini Distributed by ...

Page 4: ...manner Return appliance to the nearest authorized service facility for examination repair or adjustment 7 The use of accessory attachments not recommended by the appliance manufacturer may cause injuries 8 Do not use outdoors 9 Do not let cord hang over edge of table or counter or touch hot surfaces 10 Do not place on or near a hot gas or electric burner or in a heated oven 11 Extreme caution must...

Page 5: ...al data affixed to the machine and or its packaging The manual provides information that is current at the time of publication The information is subject to amendment or alteration without notice Your machine should only be operated in accordance with instructions contained in this manual and verbal instructions and training provided by an authorised Rocket Espresso Ltd dealer Installation and mai...

Page 6: ...instructions and advice provided with To ensure maximum performance efficiency it is essential that technical service and maintenance is carried out exclusively by Rocket Espresso Ltd authorised technicians It is the responsibility of the user to notify the manufacturer of any defects or damages which may affect the safety of the original installation or future safe operation of the machine The us...

Page 7: ... MACHINE IS INSTALLED WITH A PROPER EARTH GROUND IN ACCORDANCE TO LOCAL SAFETY PRACTISES CODES AND legislation s 0REVENT THE POWER CABLE FROM BEING STRETCHED OR PULLED TIGHT s VOID USING THE MACHINE WITH WET HANDS s EVER OPERATE THE MACHINE WITH BARE FEET Never operate the machine without ensuring the water reservoir contains water The machine must be operated with soft clean drinking water If the...

Page 8: ...s or group s progressive infusion piston Unloads hot water into drip tray once brewing process is terminated Caution its metal parts can become very hot and cause serious burns Attention to hot water flow coming out beneath after brewing process is terminated 9 Lever for brewing process control Caution its metal parts can become very hot and cause burns 10 Drip tray and grid 11 Hot water wand Can ...

Page 9: ...form to local safety standards and legislation in force at the time of installation s NSTALLATION OF ANY 2OCKET SPRESSO TD PRODUCT SHOULD ONLY BE UNDERTAKEN BY DULY AUTHORISED PROPERLY TRAINED and qualified personnel s ANGEROUS OR IMPROPER ELECTRICAL CONNECTIONS ARE EXTREMELY HAZARDOUS AND SHOULD NEVER OCCUR s LWAYS CHECK THE INTEGRITY OF THE COMPONENTS ELEMENTS OF THE MACHINE s EVER lT DEFECTIVE ...

Page 10: ... Coffee portion control Manual Boiler water level control Automatic Voltage Please see machines data plate Frequency Please see machines data plate Wattage 1300 W Dimensions Width 330 mm 13 inches Depth 425 mm 16 8 inches Height 350 mm 13 8 inches Weight 23 kg app 29 lbs ...

Page 11: ...or can become hot and could cause burns 1 Metal parts of steam handle 2 Hot steam wand and spout 6 Coffee brewing group 7 Not insulated metal parts of filter holder 8 Infusion piston 9 Not insulated parts of lever 11 Hot water wand and spout 12 Not insulated metal parts of hot water handle 1 12 2 6 7 8 9 11 ...

Page 12: ...se control the following A 1 Lever A 9 is completely down 2 Steam handle A 1 is closed 3 Hot water handle A 12 is closed 4 On off switch A 4 is on position 0 machine switched off 5 Machine is unplugged 6 Drip tray A 10 and its grid are properly positioned into the machine 1 12 4 5 9 10 ...

Page 13: ...2 and clean it carefully with food quality cleaning products It s very important that the water reservoir is always clean Please repeat this operation every day and whenever necessary 3 Fill the water tank with fresh drinking water to just over full 4 Place the tank inside the machine taking care not to spill water 14 1 2 4 ...

Page 14: ...r pressure gauge A 3 reads approximately 1 bar 11 Now open the steam handle A 1 for 5 seconds to let out some steam This operation is very important as it removes possible vacuum inside the boiler which will reflect in suction of milk inside the boiler itself once starting to steam milk Close the steam handle A 1 again 12 Wait until the boiler pressure gauge A 3 reaches again 1 Bar 13 Pull the lev...

Page 15: ...poon C Two cups metal filter basket D Two cups filter handle E One cup metal filter basket F One cup filter handle Suggestion We strongly suggest that you train how to tighten the filter holder with the metal filter basket firmly plugged in into the brewing head A 6 It seems to be an easy operation Nevertheless we think it may need some exercise A B D C E F 1 3 4 2 ...

Page 16: ... into the brewing head A 6 6 Put one cup under the filter holder spout 7 Pull the lever A 9 completely upwards 8 When the MAXIMUM extraction of 25 to 30 ml of espresso has been dispensed position the lever A 9 completely down to stop the coffee dispensing process For safety reasons and to avoid personal injury it s extremely important that the lever A 9 is positioned completely down and not just t...

Page 17: ...ter holder spouts Or one cup for a double 7 Pull the lever A 9 completely upwards 8 When the maximum extraction of 50 to 60 mls or 25 to 30 ml per cup has been achieved position the lever A 9 completely down to stop the coffee dispensing process For safety reasons and to avoid personal injury it s extremely important that the lever A 9 is positioned completely down and not just to the position whe...

Page 18: ...fully with a non abrasive damp cloth after each single use without touching it directly with any part of the body to avoid injury or damage due to the hot surface of steam wand end nozzle Caution Hot surface Example Steaming milk For the correct milk texturing and heating technique see page 28 1 Use a clean cold pitcher and fill 1 3 with cold fresh milk If milk has previously been steamed and stor...

Page 19: ...only Do not cross contaminate kitchen towels by using the same towel for cleaning the steam wand and i e kitchen tops Do not let the milk bake onto the steam wand Clogged wands and steam valves can be expensive to repair or to replace 8 Burp your steam wand A 2 immediately after using opening and closing immediately after the steam valve A 1 Caution Hot steam will come out of steam wand A 2 Burpin...

Page 20: ...20 ...

Page 21: ... remember 50 60ml over 25 to 30 seconds A dirty machine will always lead to poor results Your Espresso machine needs to be CLEAN VERY VERY CLEAN Use filtered water if you can and fresh water if you can t Use a conical burr grinder and grind your coffee really fresh ie just seconds prior to use If your beans are getting old throw them out and buy a fresh batch Buy and use a professional quality tam...

Page 22: ...nd of your espresso machine under the surface of the milk and turn the steam tap fully on Now gently lower the milk jug so the tip of the steam wand is just under the milk s surface Keeping the jug as steady as possible allow the steam wand to gently gasp the air right on the surface of the milk Slowly change the angle between the surface of the milk and the steam wand until you create a whirlpool...

Page 23: ... and have a nice fine bead of bubbles Gently bang the bottom of the jug on the bench top to settle the milk Very slowly with the jug close to the top of the cup allow the milk to slowly roll off the lip of the jug and into the cup Continue the pour in a gentle continuous motion Remember to watch what s happening at the lip of the jug as this determines the quality of the milk going into your espre...

Page 24: ... cleaning can be a chore it is an essential part of espresso preparation REQUIREMENTS Nylon brush small screwdriver or teaspoon head shampoo and back flush cap The cleaning procedure can be broken down into two main areas the handle and the group THE HANDLE The easiest part to clean With a small screw driver or teaspoon flick out the filter basket from the handle Once you have the filter basket ou...

Page 25: ... turn off the machine remove the handle and empty the water sitting in the blind filter Repeat until the discarded water is clean and fresh Next or weekly put a small amount of head shampoo into the blind filter and repeat the process as above Repeat this process until the shampoo runs clean into the drain tray via the exhaust solenoid Ensure that you back flush the machine once again so the shamp...

Page 26: ... Open the hot water valve A 12 and let hot water flow in the recipient 3 When no more hot water comes out close the hot water valve A 12 4 Put on off switch A 4 to position O machine off 5 Unplug the machine from the electrical mains Operations to be effected with machine switched off and cooled down to room temperature 1 Empty the fresh water reservoir and clean it carefully before replacing it b...

Page 27: ...olders when machine is not operating for some hours i e at night Throughout the day 1 Wipe the screens inside your group head with a damp clean towel to remove excess grounds Before shutting down the machine i e at night Caution For the following operations the machine has to be switched off unplugged and completely cooled down 1 Clean showers group gaskets and group flange with a clean brush to b...

Page 28: ...t espresso 25ml and 4 parts of frothed milk 100 ml Serve in a 190ml cup Caffe Latte A single 25ml or a double espresso 50ml topped with heated and textured but not frothed milk Served in a 190ml glass Americano ong Black Depending on the desired strength a single or a double espresso topped with hot water generally served in a 150 to 190 ml cup Caffe Mocha 1 part of chocolate syrup 1 part of espre...

Page 29: ...logged with dried milk Unscrew nozzle and clean Boiler pressure is too low Check pressure at approximately 1 bar If pressure is low check on off switch is on Boiler is overfilled Contact your authorized service rep Boiler is empty Contact your authorized service rep Heating element defective Contact your authorized service rep No water from hot water nozzle Boiler pressure is too low Check pressur...

Page 30: ... nozzle Milk in steam wand and or valve Contact your authorized service rep Shots pouring too fast Coffee grind too coarse Use finer coffee grind Shots taste bad Coffee is not fresh or not freshly ground Ensure your coffee is fresh and freshly ground Group and or filter holders and or filter baskets and or group showers screens need to be cleaned or replaced Please provide or contact your authoriz...

Page 31: ...eclaration of CE conformity Manufacturer Rocket Espresso Limited Italian Branch Viale Delle Industrie 26 20090 Settala Milano Italy This is to confirm that the Giotto series of espresso machines has been manufactured according to the following standards DIR 89 336 s s s s DIR 73 23 s s DIR 89 392 s s ...

Page 32: ...www rocket espresso com ...

Reviews: