13 ISE operation
Cedex Bio System
Daily operation
Main calibration
The main calibration of the electrodes must be performed periodically. It also needs
to be performed after certain maintenance actions.
For the indirect method, the sodium (NA-I) and potassium (K-I) tests are calibrated
with a two-point calibration using ISE Solution 1 and 2.
The main calibration is typically performed during the
Prepare
phase and, if there
follows a second shift, at the end of a shift. It is integrated in the
Daily Prepare
Actions
maintenance action.
e
For details on performing
the
Daily Prepare Actions
maintenance action
, see
For details on performing individual calibrations, see
Process of performing calibrations
Performing QC
ISE QC handling is integrated in the operation of the main instrument.
a
To perform QC
e
Summary of Contents for Cedex Bio
Page 1: ...Cedex Bio System Operator s Manual Software Version 2 1...
Page 10: ......
Page 22: ...Roche Diagnostics A 14 Operator s Manual Version 3 1 1 Safety Cedex Bio System Safety labels...
Page 130: ...Roche Diagnostics A 122 Operator s Manual Version 3 1 4 Software Cedex Bio System Buttons...
Page 131: ...5 Daily operation B 3 6 Special operations B 91 7 Configuration B 133 Operation B...
Page 132: ......
Page 303: ...8 General maintenance C 3 Maintenance C...
Page 304: ......
Page 339: ...9 Messages and alarms D 3 10 Result flags D 23 11 Troubleshooting D 39 Troubleshooting D...
Page 340: ......
Page 392: ......
Page 471: ...Glossary F 3 Index F 11 Glossary and Index F...
Page 472: ......
Page 492: ...Roche Diagnostics F 22 Operator s Manual Version 3 1 Index Cedex Bio System...
Page 493: ...Revisions G...
Page 494: ......
Page 495: ...Roche Diagnostics Operator s Manual Version 3 1 G 3 Cedex Bio System 18 Revisions Revisions...
Page 496: ...Roche Diagnostics G 4 Operator s Manual Version 3 1 18 Revisions Cedex Bio System...