![Roberts Gorden EP 301 Installation, Operation & Service Manual Download Page 24](http://html.mh-extra.com/html/roberts-gorden/ep-301/ep-301_installation-operation-and-service-manual_1469739024.webp)
EP-300 S
ERIES
P
UMP
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
18 of 31
SECTION 9: VENTING
9.1 General Ventin
g
Re
q
uirements
This p
u
mp m
u
st be
v
ented in accordance
w
ith the
r
u
les contained in this man
u
al and
w
ith the follo
w
ing
national codes and any state, pro
v
incial or local
codes
w
hich may apply:
United States:
Refer to National F
u
el Gas Code
NFPA 54/ANSI Z223.1 - latest re
v
ision.
Canada:
Refer to Nat
u
ral Gas and Propane
Installation Code CSA B149.1 - latest re
v
ision.
This section pro
v
ides partial information abo
u
t this
specification
w
ith regard to size and config
u
ration for
v
enting req
u
irements.
See Page 19, Figure 16
and
Page 20, Figure 17
. Ho
w
e
v
er, to pro
v
ide ass
u
rance
of proper and safe operation, it is the responsibility of
the installer to make s
u
re the installation is in strict
accordance
w
ith all local and national codes.
9.2 Ventin
g
the Pump
• The exha
u
st connection from the p
u
mp is 6" (15
cm) diameter.
• Connect the 6" (15 cm) p
u
mp boot (pro
v
ided) to
the 6" (15 cm) fl
u
e pipe,
u
sing the 6" (15 cm)
band clamp pro
v
ided.
• Venting from the p
u
mp may discharge either
horizontally or
v
ertically.
Horizontal dischar
g
e is
preferred.
See Page 19, Figure 16
. Vertical dis-
charge m
u
st be arranged as sho
w
n
on Page 20,
Figure 17
. Corrosion resistant pipe is req
u
ired.
• Both horizontal and
v
ertical
v
enting m
u
st be
s
u
pported by s
u
itable hangers.
• Vent lengths are allo
w
ed as follo
w
s:
9.3 Vent Material Recommendations
Vent recommendations:
1. Porcelain coated t
u
bing 4" (10 cm) O.D. (P/N
9141030D)
2. Heat treated al
u
minized t
u
bing 4" (10 cm) O.D.
(P/N 91409408)
Heat treated al
u
minized t
u
bing 6" (15 cm) O.D.
(P/N E0009105)
3. Single
w
all fl
u
e pipe - minim
u
m 26 ga.
(Not s
u
itable for mod
u
lating and condensing
system designs.)
4. Sched
u
le 40 ASTM A53 (Latest Edition) grade B
ERW black steel pipe.
NOTE:
4" (10 cm) O.D. Porcelain coated t
u
bing (P/N
914030D), 4" (10 cm) O.D. Heat treated al
u
minized
t
u
bing (P/N 91409408), and 6" (15 cm) O.D. Heat
treated al
u
minized t
u
bing (P/N E0009105) are eq
u
i
v
-
alent to single
w
all fl
u
e pipe.
9.4 Horizontal Ventin
g
If
u
sing
v
ent lengths greater than 20' (6 m),
condensation
w
ill form in the
v
ent pipe. Ins
u
lation
and additional sealing meas
u
res
w
ill be req
u
ired.
Seal all discharge pipe joints
w
ith high temperat
u
re
silicone adhesi
v
e.
WARNING
Carbon Monoxide Hazard
Pump must be vented to the outside.
Heaters must be installed according to the
installation manual.
Failure to follow these instructions can result
in death or injury.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
VENT LENGTH
VENT SIZE
Up To 10' (3 m)
6" (15 cm)
v
ent - 1 elbo
w
Up To 25' (8 m)
7" (18 cm)
v
ent - 3 elbo
w
Up To 50' (15 m)
8" (20 cm)
v
ent - 3 elbo
w
Summary of Contents for EP 301
Page 2: ......
Page 4: ......
Page 6: ......
Page 37: ...SECTION 13 THE ROBERTS GORDON EP 300 SERIES PUMP WARRANTY 31 of 31 ...
Page 38: ......