EP-200 S
ERIES
P
UMP
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
4 of 27
SECTION 3: UNPACKING THE PUMP
3.1 Open Shippin
g
Cartons
Open cartons and remo
v
e packing inserts. Caref
u
lly
remo
v
e p
u
mp components from the cartons. Lift
assembly by gripping metal p
u
mp frame. T
w
o people
are req
u
ired (
w
eight 112 lb, 51 kg). This p
u
mp has
been tested prior to packing. The impeller
w
as
dynamically balanced before assembly and req
u
ires
care in handling to a
v
oid damage.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
Summary of Contents for EP 201
Page 2: ......
Page 4: ......
Page 6: ......
Page 34: ...EP 200 SERIES PUMP INSTALLATION OPERATION AND SERVICE MANUAL 28 of 27 ...